Laserfiche WebLink
SANTIAGO CREEK FIRE PREVENTION ACTION PLAN <br />November 5, 2014 <br />Page 4 of 4 <br />varying terrain, and to get to portions of the property, OCFA /City staff would seek to traverse over <br />adjacent private property. Although OCFA /City fuel removals will be limited to City property only, staff <br />will request permission from the adjacent property owners to facilitate access to the creek and haul -off <br />the collected fuel debris either through the their yards along Park Lane, or through the creek bed. The <br />duration of the access will coincide with the period of vegetation removal. <br />City /OCFA staff will ask individual property owners to execute an access agreement. The extent of City <br />property to be cleared will depend on the number and location of neighbors willing to participate in <br />granting temporary access. Of particular importance is cooperation from the parcels at the east and <br />west edges of the narrow section of the City's property. Staff will also request permission from the <br />owners of interior Park Lane parcels through their side and rear yards to access as much of the City <br />property as possible. <br />City staff and OCFA would: <br />1) Engage in community outreach by sending a the boundary map along with a letter to all residents <br />along the Santiago Creek advising them of the inherent risk associated with combustible vegetation <br />accumulating on their private property and encourage them to remove the dead vegetation on <br />their property. <br />2) Conduct a community outreach meeting to establish a clear understanding of risks, City /OCFA staff <br />recommendations, requests and actions to be taken. Staff will clarify that the actions are strictly <br />related to safety. <br />3) Set stakes demarking property boundaries to help residents and staff visualize limits of City's <br />ownership in Santiago Creek. <br />4) Conduct a second community outreach meeting in the creek to view limits of removals and identify <br />types of vegetation to be removed. <br />5) Identify access needs and request written permission for ingress and egress for crews during <br />removals (See Required Permission to Access over Private Properties below). <br />6) Confirm removal dates and send reminder notification to the residents. <br />7) Where necessary, reset property boundary demarcation to ensure that removals by OCFA and City <br />staff do no extend beyond City ownership. <br />S) When the removals are being done, OCFA with the help of City staff will remove dead or previously <br />burned trees and brush within the City's right of way and within 100 feet of habitable structures. <br />The crews will use hand tools and cut larger trees with small power tools. The waste will be carried <br />to a designated staging location within Fisher Park and /or directly to Park Lane where private <br />property access is granted. The waste will be chipped at the staging sites and loaded into <br />dumpsters. <br />