Laserfiche WebLink
HARBOR BLVD. MIXED USE TRANSIT CORRIDOR PLAN FINAL FIR <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />HYDROLOGY AND WATER QUALITY <br />The Initial Study, included as Appendix A, substantiates that impacts associated with the following thresholds <br />would be less than significant: HYD -10. This impact will not be addressed in the following analysis. <br />5.7.3 Environmental Impacts <br />The following impact analysis addresses thresholds of significance for which the Initial Study disclosed <br />potentially significant impacts. The applicable thresholds are identified in brackets after the impact statement. <br />Buildout of the proposed Harbor Corridor Plan would involve the following net increases: 3,884 dwelling <br />units; 15,327 persons; 13,721 square feet of commercial uses; and 173 employees. All of the changes in <br />development potential would occur throughout various areas of the Harbor Corridor Plan. <br />No changes to development potential would occur in the 120 -acre Conventional Zoning Area. There would <br />be no hydrology or water quality impacts to the Conventional Zoning Area since no new development would <br />occur in this area and the existing land uses would remain. As a result, the analysis below focuses on the <br />portion of the project that covers the Harbor Corridor Plan. <br />Impact 5.7 -1: Development pursuant to the Harbor Corridor Plan would not substantially change the <br />amount of impervious surfaces in the project area and would therefore not substantially <br />Impact Analysis: The project area is in a highly urbanized area of the City, it is not used for groundwater <br />recharge and is not in or near any groundwater recharge areas. Additionally, much of the existing commercial <br />and automotive land uses in the project area are developed with buildings and paved parking lots with <br />minimal landscaping. Approximately 11.6 acres of the project area are vacant and 4.5 acres are open space, <br />for a total of approximately 16.1 acres of land uses consisting of pervious surfaces. <br />Development standards for landscaping outlined in the Harbor Corridor Plan would result in approximately <br />20 percent, or 50.6 acres, of parcelized area within the project area being landscaped at project buildout. This <br />area would include private yards; common areas in private development projects; and landscaping in public <br />rights- of-way such as parkways and medians. This does not include Willowick Golf Course, which is outside <br />of the Harbor Corridor Plan area. Project implementation would therefore increase impervious surfaces in <br />the project area. Furthermore, priority development projects as defined in the MS4 Permit2 would be required <br />to infiltrate, filter, or treat runoff flow rates or volumes specified in the MS4 Permit. Therefore, <br />implementation of the Harbor Corridor Plan would not substantially reduce groundwater recharge. <br />2 Priority development projects for which WQMPs are required include: <br />• Redevelopment projects adding or replacing 5,000 square feet or more of impervious surfaces. <br />• Development projects creating 10,000 square feet or more of impervious surfaces. <br />• Restaurants of 5,000 or more square feet area. <br />• Puking lots of 5,000 square feet or more. <br />October 2014 Page 5.7 -19 <br />