My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-069 - Final Environmental Impact Report No. 2014-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2014
>
2014-069 - Final Environmental Impact Report No. 2014-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 10:54:14 AM
Creation date
11/18/2014 10:38:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2014-069
Date
10/21/2014
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HARBOR BLVD. MIXED USE TRANSIT CORRIDOR PLAN FINAL FIR <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />HYDROLOGY AND WATER QUALITY <br />cumulative projects in conjunction with individual development projects that would be accommodated by the <br />Harbor Corridor Plan are not expected to cause substantial cumulative impacts to storm drainage capacity in <br />the region. <br />Flood Hazard Impacts <br />Cumulative projects would increase the numbers of people and buildings in 100 -year flood zones and in dam <br />inundation zones within the Santa Ana. River Watershed. Flood control improvements along the Santa Ana <br />River would reduce hazards from 100 year floods and from potential dam inundation throughout 100 year <br />flood zones in the Santa Ana River Watershed in Orange County, and throughout the dam inundation zone <br />for Prado Dam. Therefore, the proposed projects flood hazard impacts would not be cumulatively <br />considerable. <br />5.7.5 Existing Regulations <br />State <br />• General Construction Activity Permit, Order No. 2009- 0009 -DWQ; NPDES No. CAS000002 <br />City of Santa Ana <br />• MS4 NPDES permit <br />• Drainage Area Master Plan Fees <br />5.7.6 Level of Significance Before Mitigation <br />Upon implementation of regulatory requirements and standard conditions of approval, the following impacts <br />would be less than significant: 5.7 -1, 5.7 -2, and 5.7 -7. <br />Without mitigation, the following impacts would be potentially significant: <br />■ Impact 5.7 -3 Significant impacts to the storm drain system in the project area could occur as a <br />result of project implementation. <br />■ Impact 5.7 -4 Construction could result in a short -term increase in pollutant concentrations in <br />runoff. <br />■ Impact 5.7 -5 Project implementation could result in a change to the quality of stormwater runoff <br />■ Impact 5.7 -6 Individual projects within the Harbor Corridor Plan may be located within a 100 <br />year flood zone. <br />Page 5.7 -2% PlaceWorkr <br />
The URL can be used to link to this page
Your browser does not support the video tag.