Laserfiche WebLink
HARBOR BLVD. MIXED USE TRANSIT CORRIDOR PLAN FINAL FIR <br />CITY OF SANTA ANA <br />7. Alternatives to the Proposed Project <br />this alternative would reduce impacts to air quality, impacts would remain significant and unavoidable. In <br />addition, this alternative would meet most of the project objectives, but to a lesser degree tban the project. <br />Among the factors that may be used to eliminate alternatives from detailed consideration in an EIR are: <br />(i) failure to meet most of the basic project objectives, (n) infeasibility, or (iii) inability to avoid significant <br />environmental impacts." [Guidelines Sec. 15126.6(c)] <br />Table 7 -5 Summary of Impacts of Alternatives Compared to the Pr000sed Proiect <br />Topic <br />Proposed Project <br />No Project Alternative <br />Reduced Residential <br />Intensity Alternative <br />Aesthetics <br />ITS <br />H <br />H <br />Air Quality <br />Construction <br />Operation <br />SU <br />SU <br />N <br />H <br />H <br />H <br />Cultural Resources <br />LTS/M <br />N <br />N <br />Geology and Soils <br />ITS <br />N <br />N <br />Greenhouse Gas Emissions <br />ITS <br />H <br />H <br />Hazards and Hazardous Materials <br />LTS /M <br />N <br />H <br />Hydrology and Water Quality <br />ITS <br />N <br />N <br />Land Use and Planning <br />ITS <br />H <br />N <br />Noise <br />- Construction <br />- Operation <br />LTS/M <br />LTS /M <br />N <br />H <br />H <br />H <br />Population and Housing <br />ITS <br />H <br />H <br />Public Services <br />ITS <br />H <br />H <br />Recreation <br />ITS <br />H <br />H <br />Transporhation/Traffc <br />LTS/M <br />H <br />H <br />Utilities and Service Systems <br />LTS /M <br />H <br />H <br />Notes: C I b: Less man signmcam; a stM: Less man slgnlncant wan Mitigation Inmiporam; su: slgnnlcara ana unavowaule <br />H The alternative would result in less of an impact than the proposed project <br />( +) The alternative would result in greater impacts than the proposed project. <br />(_) The alternative would result in the same/similar impacts as the proposed project . <br />Page 7 -12 PlaceWorkr <br />