My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-069 - Final Environmental Impact Report No. 2014-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2014
>
2014-069 - Final Environmental Impact Report No. 2014-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 10:54:14 AM
Creation date
11/18/2014 10:38:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2014-069
Date
10/21/2014
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Harbor Boulevard Mixed Use Transit Corridor Plan <br />Findings and Facts in Support of Findings and Statement of Overriding Considerations <br />• Enhance community health and wellness by creating safer street design for multiple <br />modes of travel, increase walkability and encourage live /work along the corridor. <br />3. ENVIRONMENTAL REVIEW AND PUBLIC PARTICIPATION <br />The Final EIR includes the Draft Environmental Impact Report (Draft EIR) dated April 2014, <br />written comments on the Draft EIR that were received during the 45 -day public review period, <br />and written responses to those comments and clarifications /changes to the EIR. In conformance <br />with CEQA and the State CEQA Guidelines, the City conducted an extensive environmental <br />review of the Harbor Corridor Plan project: <br />• Completion of the Notice of Preparation (NOP), which was released for a 30 -day <br />public review period from June 13, 2013 through July 15, 2013. The NOP for the <br />Draft EIR was published in the June 15, 2013 edition of the Orange County Register, <br />a newspaper of general circulation. The NOP was sent to all responsible agencies, <br />trustee agencies, and the Office of Planning Research and posted at the Orange <br />County Clerk- Recorder's office and on the City's website on June 11, 2013. <br />• During the NOP review period, a Scoping Meeting was held to solicit additional <br />suggestions on the content of the Harbor Boulevard Mixed Use Transit Corridor Plan <br />EIR. Attendees were provided an opportunity to identify verbally or in writing the <br />issues they felt should be addressed in the EIR. The scoping meeting was held on <br />Tuesday, June 25, 2013, at 6:00 pm at Santa Ana Union Hall, 3904 West First <br />Street, Santa Ana, CA 92701. The notice of the public scoping meeting was included <br />in the NOP. <br />• Preparation of a Draft EIR by the City that was made available for a 45 -day public <br />review period (April 18, 2014, to June 2, 2014). The Draft EIR consisted of analysis <br />of the Harbor Boulevard Mixed Use Transit Corridor Plan project and appendices <br />used to prepare that analysis. Appendices included the Initial Study and Notice of <br />Preparation, NOP comment letters, and technical appendices. The Notice of <br />Availability (NOA) for the Draft EIR was distributed April 18, 2018. The NOA was <br />sent to all interested persons, agencies and organizations. The Notice of Completion <br />(NOC) was sent to the State Clearinghouse in Sacramento for distribution to public <br />agencies. The NOA was posted at the Orange County Clerk- Recorder's office on <br />April 18, 2014. Copies of the Draft EIR were made available for public review at the <br />City of Santa Ana Planning Counter (20 Civic Center Plaza) and the Santa Ana <br />Public Library (26 Civic Center Plaza). The Draft EIR was available for download via <br />the City's website: http:/( www .cisanta- ana.ca.us /harborplan /. <br />• The Planning Commission held a public hearing on May 12, 2014 to receive public <br />input on the Draft EIR during the 45 -day public review period. The hearing was held <br />at the Santa Ana City Council Chambers at 22 Civic Center Plaza, Santa Ana, <br />California, 92701. Notices of time, place, and purpose of the aforesaid meeting was <br />provided in accordance with CEQA and the City's Municipal Code. Oral testimony <br />was presented by the public this this hearing. Notice for the May 14, 2014 meeting <br />was published along with the NOA. Additionally, the item appeared on the agenda for <br />these meetings, which was posted at City Hall and on the City website. <br />• Preparation of a Draft Final EIR including Draft EIR, comments on the Draft EIR, <br />responses to those comments, clarifications /revisions to the Draft EIR, Mitigation <br />10 July 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.