My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-069 - Final Environmental Impact Report No. 2014-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2014
>
2014-069 - Final Environmental Impact Report No. 2014-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2014 10:54:14 AM
Creation date
11/18/2014 10:38:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2014-069
Date
10/21/2014
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Harbor Boulevard Mixed Use Transit Corridor Plan <br />Findings and Facts in Support of Findings and Statement of Overriding Considerations <br />The Harbor Corridor Plan emphasizes a sustainable multimodal approach consistent <br />with the City's Go Local Transit Vision, which aims to link downtown, employment <br />centers, educational facilities, and expanded housing choices. The project proposes <br />mixed -use and residential, pedestrian- oriented development at high densities that would <br />support increased transit use — within the three transit nodes surrounding the <br />intersections of Harbor Boulevard at 17th Street, 1st Street, and McFadden Avenue. A <br />limited -stop bus route, Orange County Transportation Authority (OCTA) Route 543, <br />began service on Harbor Boulevard between Fullerton and Santa Ana, through the <br />project site, in June 2013. Route 543 has stops at each of the three proposed transit <br />nodes. Development of a light -rail transit line on the Pacific Electric right -of -way that <br />passes through the north end of the project site was recommended by an Alternatives <br />Analysis completed by the Southern California Association of Governments in February <br />2013 (SCAG 2013). A fixed guideway transit project on the part of the Pacific Electric <br />right -of -way in Santa Ana and Garden Grove is part of the Preferred Plan in OCTA's <br />Long Range Transit Plan (OCTA 2011). Completion of a transit line on the portion of the <br />right -of -way in Los Angeles County is scheduled for 2027 (Metro 2009). <br />In addition to providing jobs and housing near a major transportation corridor, the Harbor <br />Corridor Plan continues to recognize the important role Harbor Boulevard plays in <br />circulating vehicular traffic through the region by maintaining the number of traffic lanes. <br />The Harbor Corridor Plan also encourages consolidated vehicular access points along <br />the corridor. <br />The Harbor Corridor Plan proposes improved pedestrian and bicycle facilities and <br />linkages by creating a pedestrian - friendly streetscape, encouraging a variety of building <br />frontages and decreased setbacks. New street designs facilitate safe bicycle and <br />pedestrian travel along Harbor Boulevard and efficient connections to the regional <br />bicycle network, including the Santa Ana River Trail. <br />Although the Harbor Corridor Plan would result in substantial population growth, it would <br />provide an overall benefit to the community by encouraging walkability and alternative <br />transportation. The Harbor Corridor Plan is a sustainable multimodal plan that at buildout <br />encourages the reduction of per- capita vehicle miles traveled for the region, which is one <br />of the goals of SCAG's Compass Blueprint for HQTAs. By providing additional <br />commercial square footage in the area, commuters would not need to travel outside the <br />City to other areas of Orange County for employment. <br />C. THE HARBOR CORRIDOR PLAN IMPROVES THE JOBS -TO- HOUSING <br />BALANCE IN THE CITY <br />Implementation of the project would improve Santa Ana's jobs- housing balance. Effects <br />of Harbor Corridor Plan buildout on jobs- housing balance in the City are estimated by <br />adding project - generated jobs and housing units to forecasts of employment and <br />housing in the City of Santa Ana in 2035 (see Table 3). As shown in the table, Santa <br />Ana's existing jobs- housing ratio is 1.87, or jobs -rich. The jobs- housing ratio is forecast <br />to become slightly more jobs -rich (1.91) by 2035. Buildout of the Harbor Corridor plan <br />would develop up to 4,623 housing units, a net increase of 3,884 units over the existing <br />739 units onsite; and would add an estimated net increase of 173 jobs to the site. The <br />jobs- housing balance in Santa Ana with project buildout added to existing forecast would <br />49 July 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.