My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - SANTA ANA GRADE SEPARATION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
19E - SANTA ANA GRADE SEPARATION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 2:57:11 PM
Creation date
11/26/2014 2:22:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Blvd. Grade Separation <br />Table 3 - Intersection LOS <br />Notes: <br />AWSC - all -way stop controlled intersection; TWSC - two -way stop controlled intersection; Delay expressed in terms of seconds <br />Bold denotes unacceptable LOS <br />' ICU reported for all signalized locations, except Caltrans facilities. Delay (reported in seconds per vehicle) is reported for all <br />unsignalized intersections and Caltrans facilities. For AWSC, the average delay is calculated whereas for TWSC, the delay of the <br />worst approach is calculated. <br />5 ALTERNATIVES <br />The Project Development Team (PDT) explored various alternatives to address the need and <br />purpose of this project, taking into account the constraints presented by the project area and the <br />City's desired traffic operations. Both an overhead alternative and an underpass alternative were <br />discussed among the PDT members. However, the overcrossing alternative was deemed non- <br />viable because of concerns and opposition expressed by members of an adjacent neighborhood. <br />A No -Build Alternative was not considered, with the exception of within the traffic studies <br />PROJECT REPORT EQUIVALENT 19E -16 <br />Intersection <br />Traffic <br />Control <br />Without Project <br />With Project <br />AM Peak <br />Hour <br />PM Peak <br />Hour <br />AM Peak <br />Hour <br />PM Peak <br />Hour <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />Santiago St/Santa Ana Blvd <br />Signal <br />0.479 <br />A <br />0.538 <br />A <br />0.532 <br />A <br />0.588 <br />A <br />Delay <br />LOS <br />Delay <br />LOS <br />Delay <br />LOS <br />Delay <br />LOS <br />c <br />Grand Ave /Santa Ana Blvd <br />Signal <br />28.1 <br />C <br />25.7 <br />C <br />28.1 <br />C <br />25.7 <br />C <br />Santiago St/Civic Center Dr <br />AWSC <br />11.4 <br />B <br />12.3 <br />B <br />11.6 <br />B <br />12.4 <br />B <br />F. <br />Logan St/Santa Ana Blvd <br />TWSC <br />11.2 <br />B <br />9.7 <br />B <br />n 1a2 <br />n 1a2 <br />H <br />W <br />SARTC Dwy /Santa Ana Blvd <br />TWSC <br />9.7 <br />A <br />11.8 <br />8 <br />9.7 <br />A <br />11.8 <br />8 <br />Fuller St/Santa Ana Blvd <br />TWSC <br />>50 <br />F <br />>50 <br />F <br />>50 <br />F <br />>50 <br />F <br />1 -5 SB Ramps /Santa Ana Blvd <br />Signal <br />25.5 <br />C <br />26.4 <br />C <br />25.6 <br />C <br />26.4 <br />C <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />m <br />Santiago St/Santa Ana Blvd <br />Signal <br />0.521 <br />A <br />0.598 <br />A <br />0.587 <br />A <br />0.662 <br />B <br />N <br />Delay <br />LOS <br />Delay <br />LOS <br />Delay <br />LOS <br />Delay <br />LOS <br />a <br />Grand Ave /Santa Ana Blvd <br />Signal <br />28.8 <br />C <br />26.4 <br />C <br />29.4 <br />C <br />26.7 <br />C <br />Santiago St/Civic Center Dr <br />AWSC <br />12.3 <br />B <br />13.3 <br />B <br />12.8 <br />B <br />13.9 <br />B <br />= <br />Logan St/Santa Ana Blvd <br />TWSC <br />11.6 <br />B <br />9.8 <br />A <br />n 1a2 <br />n /a2 <br />n /a2 <br />n /a2 <br />a <br />SARTC Dwy /Santa Ana Blvd <br />TWSC <br />9.9 <br />A <br />12.5 <br />B <br />10.0 <br />A <br />12.7 <br />B <br />O <br />Fuller St/Santa Ana Blvd <br />TWSC <br />>50 <br />F <br />>50 <br />F <br />>50 <br />F <br />>50 <br />F <br />1 -5 SB Ramps /Santa Ana Blvd <br />Signal <br />26.0 <br />C <br />26.6 <br />C <br />1 26.3 <br />C <br />26.8 <br />C <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />1 <br />Santiago St/Santa Ana Blvd <br />Signal <br />0.771 <br />C <br />0.774 <br />C <br />0.771 <br />C <br />0.773 <br />C <br />H <br />Santiago SUCivic Center Dr <br />Signal <br />0.559 <br />A <br />0.610 <br />8 <br />0.565 <br />A <br />0.619 <br />8 <br />.N <br />Delay <br />LOS <br />Delay <br />LOS <br />Delay <br />LOS <br />Delay <br />LOS <br />Grand Ave /Santa Ana Blvd <br />Signal <br />32.1 <br />C <br />37.8 <br />D <br />32.1 <br />C <br />37.8 <br />D <br />Logan St/Santa Ana Blvd <br />TWSC <br />12.9 <br />B <br />10.7 <br />B <br />n 1a2 <br />n 1a2 <br />n 1a2 <br />n 1a2 <br />7 <br />SARTC Dwy /Santa Ana Blvd <br />TWSC <br />9.7 <br />A <br />14.7 <br />B <br />9.7 <br />A <br />14.7 <br />B <br />Fuller St/Santa Ana Blvd <br />TWSC <br />>50 <br />F <br />>50 <br />F <br />>50 <br />F <br />>50 <br />F <br />1 -5 SB Ramps /Santa Ana Blvd <br />Signal <br />31.7 <br />1 C <br />1 30.7 <br />1 C <br />31.8 <br />C <br />30.7 <br />C <br />Notes: <br />AWSC - all -way stop controlled intersection; TWSC - two -way stop controlled intersection; Delay expressed in terms of seconds <br />Bold denotes unacceptable LOS <br />' ICU reported for all signalized locations, except Caltrans facilities. Delay (reported in seconds per vehicle) is reported for all <br />unsignalized intersections and Caltrans facilities. For AWSC, the average delay is calculated whereas for TWSC, the delay of the <br />worst approach is calculated. <br />5 ALTERNATIVES <br />The Project Development Team (PDT) explored various alternatives to address the need and <br />purpose of this project, taking into account the constraints presented by the project area and the <br />City's desired traffic operations. Both an overhead alternative and an underpass alternative were <br />discussed among the PDT members. However, the overcrossing alternative was deemed non- <br />viable because of concerns and opposition expressed by members of an adjacent neighborhood. <br />A No -Build Alternative was not considered, with the exception of within the traffic studies <br />PROJECT REPORT EQUIVALENT 19E -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.