My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - SANTA ANA GRADE SEPARATION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
19E - SANTA ANA GRADE SEPARATION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 2:57:11 PM
Creation date
11/26/2014 2:22:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessment is anticipated for the proposed project. Where feasible the project would include <br />landscaping and would provide architectural elements on the new structure. This will be further <br />addressed in the Visual Impact Assessment that is prepared. <br />Relocation Imuacts <br />23. Will the project require the relocation of residential or business properties? The proposed <br />project would not require the relocation of any residences. A total of sixteen commercial parcels <br />would be acquired, which would require the relocation of approximately eleven businesses and three <br />County buildings /operations. Two acquisition parcels do not currently have tenants. This will be <br />further evaluated in the Relocation Impact Study and Community Impact Assessment that are <br />prepared. <br />Land Use. Communitv. and Farmlands Imuacts <br />24. Will the project require any right of way, including partial or full takes? Consider construction <br />easements and utility relocations. The proposed project would require the full acquisition of <br />sixteen properties, which all contain commercial /industrial /maintenance facility uses and are <br />presented below. As shown below, partial acquisition and temporary construction easements (TCEs) <br />would be required on two properties and TCEs only would be required on three properties. This will <br />be further evaluated in the Relocation Impact Study and Community Impact Assessment that are <br />prepared. <br />Acauisitions <br />Parcel No. <br />Full Acquisition <br />Partial Acquisition <br />Temporary Construction <br />Easement <br />Status <br />398 - 101 -15 <br />No <br />Yes <br />Yes <br />Active <br />398 - 101 -16 <br />No <br />Yes <br />Yes <br />Active <br />398 - 208 -01 <br />Yes <br />No <br />No <br />Active <br />398 - 207 -01 <br />Yes <br />No <br />No <br />Active <br />398 - 361 -07 <br />Yes <br />No <br />No <br />Active <br />398 - 361 -12 <br />Yes <br />No <br />No <br />Active <br />931 - 104 -67 <br />Yes <br />No <br />No <br />Active <br />931 - 104 -68 <br />Yes <br />No <br />No <br />Active <br />398 - 362 -01 <br />Yes <br />No <br />No <br />Active <br />398 - 093 -13 <br />Yes <br />No <br />No <br />Vacant <br />398 - 093 -08 <br />Yes <br />No <br />No <br />Active <br />398 - 093 -07 <br />Yes <br />No <br />No <br />Active <br />398 - 093 -06 <br />Yes <br />No <br />No <br />Active <br />398 - 093 -05 <br />Yes <br />No <br />No <br />Active <br />398 - 093 -04 <br />Yes <br />No <br />No <br />Active <br />398 - 093 -03 <br />Yes <br />No <br />No <br />Active <br />398 - 093 -01 <br />Yes <br />No <br />No <br />Active <br />398 - 092 -02 <br />Yes <br />No <br />No <br />Vacant <br />398 - 092 -13 <br />No <br />No <br />Yes <br />Active <br />398 - 092 -14 <br />No <br />No <br />Yes <br />Active <br />25. Is the project inconsistent with plans and goals adopted by the community? <br />The City of Santa <br />Ana General Plan Circulation <br />Element (Adopted February 2, 1998 and reformatted January 2010) <br />6 <br />19E -77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.