Laserfiche WebLink
CATEGORICAL EXEMPTION /CATEGORICAL EXCLUSION DETERMINATION FORM <br />Continuation Sheet <br />Ana N/A <br />inued from page 1: <br />existing at -grade crossing is used by several passenger rail lines including Metrolink Orange County and Inland <br />,ire /Orange County lines and the Amtrak Pacific Surfliner line. For Metrolink lines, the existing service schedule <br />ides the following: <br />Orange County (OC) Line: Two trains per hour per direction in both the weekday AM and PM peak hours and <br />22 trains per day in each direction. <br />peak hours and 20 trains per day in each direction. <br />Amtrak Pacific Surfliner operates with one train per day in the peak hour each way and 13 to 14 trains per day each <br />direction. The Burlington Northern Santa Fe (BNSF) freight rail traffic also uses this crossing with approximately 10 <br />freight trains per day during off -peak hours, resulting in a total of 66 train crossings during a typical weekday. <br />Proposed project improvements extend along Santa Ana Boulevard from approximately Santiago Street at the west end <br />to the west side of the Interstate 5 (1 -5) southbound off -ramp intersection with Santa Ana Boulevard. As part of the grade <br />separation the proposed project includes: minor improvements to the Santa Ana Boulevard /Santiago Street intersection; <br />terminating Logan Street north of Santa Ana Boulevard by constructing a cul -de -sac, and improvements to Fuller Street, <br />both north and south of Santa Ana Boulevard. <br />Construction of the underpass bridge (i.e., roadway going under the railroad tracks) includes; retaining walls; two <br />pedestrian bridges (one on each side of the railroad bridge, installation of paving, curbs, gutters, medians, sidewalks, <br />streetlights, landscape and irrigation features, and drainage facilities, and the relocation of utilities. The proposed <br />pedestrian bridges would allow connectivity of the residential neighborhood west of the railroad and potential mixed -use <br />developments east of the railroad bridge with SARTC. The exact bridge type and configuration will be determined during <br />the final design phase of the project. <br />During construction the project proposes to construct a temporary two track shoofly railroad alignment for the purpose of <br />constructing the underpass structure while maintaining railroad service, which is to be constructed beginning just south <br />of the existing Metrolink crossing of 1 -5 and terminating south of SARTC near 4th Street. This shoofly alignment would <br />be located east of the existing railroad alignment. The project also proposes to construct a four -lane detour road south of <br />Santa Ana Boulevard, which would be used by traffic during the construction of the underpass bridge and its <br />approaches. The project also proposes to use Fruit Street as a detour route during the final phase of construction. New <br />right -of -way, including both permanent acquisition and temporary easements, would be required for the construction of <br />the shoofly and detour road. <br />No significant environmental consequences are anticipated with the proposed project. However, please find the attached <br />Environmental Commitments Record (ECR), which lists all the commitments that must be met and documented <br />throughout the project. <br />February 12, 201.1 <br />