Laserfiche WebLink
Attachment 2 <br />Payment Schedule <br />City of Santa Ana <br />Contract Number ML14012 <br />Cost Breakdown <br />No funds shall be paid out to CONTRACTOR pursuant to this Contract, until the project <br />described in Attachment 1 is completed and proof of completion is provided to SCAQMD, If the <br />project described in Attachment 1 is not completed and satisfactory proof of completion Is not <br />provided to 5CAQMD, no monies shall be due and payable to CONTRACTOR. However, <br />reimbursement may be made for vehicles even if EV charging station installation is not yet <br />complete, orvice versa. Proof of completion shall include: <br />• For vehicles: <br />• Proof of vehicle delivery, vehicle acceptance, and placement of vehicle into service <br />• Documentation of the specific engine installed in the vehicle, including the year, <br />manufacturer, and model <br />• For EV charging stations: <br />• Representative photos of completed stations; <br />• a report signed by a responsible official certifying that the station has been completed <br />as described in Attachment 1; and <br />• receipts for equipment and/or invoice(s) from subcontractor(s) performing the <br />Installations, if any. <br />If, at the completion of the Project, the expenditures are less than the Total Cost amount <br />above, the actual amount of AB 2766 Discretionary Funds reimbursed to CONTRACTOR shall be <br />adjusted on a prorated basis, as follows: <br />• For vehicles, the amount reimbursed to CONTRACTOR shall not exceed the actual <br />amount of AB 2766 Subvention and other funds applied, up to a maximum of $30,000 <br />per heavy -duty vehicle; and <br />61 <br />20E -16 <br />Maximum <br />AB2766 <br />CONTRACTOR <br />Additional <br />Purchase <br />Discretionary <br />AB2766 <br />Other Funds <br />Protect Co- <br />Category <br />Funds <br />Subvention <br />Applied to <br />Funding(not <br />Total Cost <br />payable <br />Funds <br />Match <br />matched) <br />under this <br />Applied <br />Contract <br />$210,000 (not <br />LPG - fueled <br />to exceed <br />heavy -duty <br />$30,000 per <br />$D <br />$210,000 <br />$220,000 <br />$640,000 <br />vehicles <br />vehicle) <br />EV Charging <br />$34,000 <br />$34,000 <br />$0 <br />$0 <br />$68,000 <br />Stations <br />Totals _ <br />$244,000 <br />$34,000 <br />$210,000 <br />$220,000 <br />708 000 <br />No funds shall be paid out to CONTRACTOR pursuant to this Contract, until the project <br />described in Attachment 1 is completed and proof of completion is provided to SCAQMD, If the <br />project described in Attachment 1 is not completed and satisfactory proof of completion Is not <br />provided to 5CAQMD, no monies shall be due and payable to CONTRACTOR. However, <br />reimbursement may be made for vehicles even if EV charging station installation is not yet <br />complete, orvice versa. Proof of completion shall include: <br />• For vehicles: <br />• Proof of vehicle delivery, vehicle acceptance, and placement of vehicle into service <br />• Documentation of the specific engine installed in the vehicle, including the year, <br />manufacturer, and model <br />• For EV charging stations: <br />• Representative photos of completed stations; <br />• a report signed by a responsible official certifying that the station has been completed <br />as described in Attachment 1; and <br />• receipts for equipment and/or invoice(s) from subcontractor(s) performing the <br />Installations, if any. <br />If, at the completion of the Project, the expenditures are less than the Total Cost amount <br />above, the actual amount of AB 2766 Discretionary Funds reimbursed to CONTRACTOR shall be <br />adjusted on a prorated basis, as follows: <br />• For vehicles, the amount reimbursed to CONTRACTOR shall not exceed the actual <br />amount of AB 2766 Subvention and other funds applied, up to a maximum of $30,000 <br />per heavy -duty vehicle; and <br />61 <br />20E -16 <br />