Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />The concrete pavement shall be immediately barricaded upon its installation and no vehicular <br />traffic will be permitted thereon until the expiration of 3 days. <br />Payment for constructing permanent P.C.C. concrete trench pavement replacement and bus <br />pad replacement shall be included in the unit price bid for other items of work and no <br />additional compensation will be allowed therefore. <br />3.05 PORTLAND CEMENT CONCRETE CROSS GUTTER <br />This work shall consist of replacing Portland Cement Concrete (PCC) cross - gutter from the <br />spandrel to street centerline (cold joint to cold joint) to facilitate water main construction. All <br />work shall be accomplished in accordance with City of Santa Ana Standard Plan No. 1109. The <br />replacement areas are clearly indicated on the plans. <br />Concrete shall be high early strength concrete, treated in accordance with section 201 -1 to <br />obtain 7 day compressive strength in 3 days. <br />Payment for constructing Portland Cement Concrete cross gutters replacement shall be <br />included in the unit price bid for other items of work and no additional compensation will be <br />allowed therefore. <br />3.06 LANDSCAPING AND IRRIGATION REPAIR <br />This section shall conform to Sections 212 and 308 of the Standard Specifications and these <br />Technical Provisions. <br />All lawn and landscaped areas disturbed by the Contractor as part of or as a result of the work <br />shall be prepared /brought to adjacent grade and restored to match existing landscaping. If <br />there are any existing sprinkler heads and irrigation lines in the construction areas, whether <br />on public or private property, they shall be replaced or relocated by the Contractor. <br />The text of Subsection 308 -8 of the Standard Specifications is hereby deleted and replaced <br />with the following: <br />All costs to the Contractor for landscaping and irrigation work in areas disturbed by the <br />Contractor shall be included in other items of work and shall include full compensation for <br />furnishing all materials, labor, equipment, tools and incidentals to perform all work necessary <br />to complete and maintain the landscaping and irrigation work. <br />T -3f <br />23A -101 <br />