Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />inconvenience to the customer. Contractor shall coordinate these activities with the City of <br />Santa Ana Water Resources Division a minimum of four (4) working days prior to beginning <br />tie -ins. When necessary, such work shall be performed after -hours or on weekends as <br />directed by the Engineer. In no case shall any property be without service for more than four <br />(4) hours. In special circumstances, emergencies, or when directed by the Engineer, the <br />Contractor shall provide temporary service lines, with approved NSF hoses, to prevent any <br />interruption in service. <br />The unit price per linear foot for PVC water main shall include full compensation for furnishing <br />all pipe, fittings, appurtenances, labor, materials, tools and equipment for all related items of <br />work necessary for the water main installation complete in place, backfilled, paved, and <br />tested. <br />Any increase in the depth of excavation of eighteen (18) inches or less shall be considered to <br />be included in the contract unit price for said work and no additional compensation will be <br />allowed. <br />3.09 BORE AND JACK, INSTALL STEEL CASING AND PVC CARRIER PIPE <br />This section describes Bore and Jack Casing with Carrier pipe at approved locations under <br />landscaped medians as shown on plans. Bore and Jack operations including the installation of <br />carrier pipe shall conform to the applicable provisions of Section 306 of the Standard <br />Specifications, these Technical Provisions, as directed by the Engineer and as shown on the <br />Contract Documents. <br />a. All work shall be as set forth in the rules and regulations of the division of <br />Occupational Safety and Health of the state of California. <br />b. It is the contractor's responsibility to be thoroughly familiarized with the project area. <br />There is no warrantee or guarantee either expressed or implied that the conditions <br />indicated by the Construction Documents or records thereof, are representative of the <br />conditions existing throughout the project area. Investigating the site and <br />determination of the site soil conditions prior to bidding is the sole responsibility of <br />the contractor. Any subsurface investigation by the bidder or contractor must be <br />approved by the City of Santa Ana. <br />c. Casing and carrier pipe installation shall be performed in a way that will not interfere <br />with, interrupt or endanger roadway surface, median landscaping, and minimize <br />subsidence of the surface, structures, and utilities above and in the vicinity of the <br />bore. The contractor shall be responsible for all settlement resulting from boring <br />operations and shall repair and restore damaged property to its original or better <br />condition at no additional cost to the owner. <br />T -3j <br />23A -105 <br />