Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />Item <br />Bid Item <br />Unit <br />Qty <br />Base Bid <br />Base Bid <br />Alternate# <br />Alternate #1 <br />Night <br />Night <br />lUnit Price <br />Day Work <br />Work Unit <br />Work <br />Day Work <br />Amount <br />Price <br />Amount <br />New Fire Hydrant <br />-b <br />®U <br />7 <br />Assembly, Including <br />EA <br />17 <br />$y /��01 <br />$ f " �o <br />$ ®�� /o® <br />Gate Valve and Lateral <br />Pipe <br />$ <br />1" Air Vacuum and <br />Release Valve <br />EA <br />4 <br />9 <br />Vertical Offset per City <br />$ <br />$ <br />$ <br />$,o <br />Std. Plan 1413B <br />EA <br />4 <br />10. <br />8" Wedge Gate <br />$� <br />$ 2 `0 <br />$ 6 T-00 0 <br />$ a <br />EA <br />EA <br />12 <br />11. <br />12" Resilient Wedge <br />$ ,m 4-w <br />$ ®!3 <br />$ 000 <br />$ a c ao <br />Gate Valve <br />EA <br />11 <br />Bore and Jack, Install <br />12. <br />Steel Casing and PVC <br />EA <br />4 <br />$ ado <br />$ z,' <br />$ e e <br />$ eao0 , 90 <br />Carrier Pipe <br />13. <br />Traffic Loop Detector <br />EA <br />45 <br />$ ° <br />$ /Z 3 7 5' <br />$ c, <br />$1__WQ_,4La <br />14. <br />Signing and Striping <br />LS <br />1 <br />$ 2 <br />$ �,7 <br />$ <br />$ � <br />15. <br />Traffic Control and <br />LS <br />1 <br />$ <br />$7-7,00'0 <br />$ b <br />$ <br />Traffic Control Plan <br />TOTAL BID <br />✓S y S S e�. OC <br />"73 e <br />The lowest responsible bidder shall be selected based on the BASE BID Amount. The City <br />reserves the right to award the Base Bid, and any, all or none of the alternate Bid Items. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete said work within one hundred and twenty <br />five (125) working days after the commencement date stated in the Notice to Proceed. The <br />bidder also proposes to commence construction of the Work within thirty (30) calendar days <br />after issuance of a Notice To Proceed, and to continue in a diligent and workman -like manner <br />without interruption, and to complete the construction thereof within the time specified above. <br />P -ib <br />Sect o 3 -a „ro��aI "v_22-2"1A <br />23A -22 <br />