My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />SECTION 4 - CONTROL OF MATERIALS <br />4 -1.3 Inspection Requirements <br />Add the following to this subsection: <br />At the option of the Engineer, the source of supply of each of the materials shall be approved <br />by the Engineer before delivery is started and before such material is used in the work. <br />Representative preliminary samples of the character and quality prescribed shall be submitted <br />by the contractor or producer of material to be used in the work, for testing or examination as <br />desired by the Engineer. All tests of industry materials furnished by the contractor shall be <br />made in accordance with commonly recognized industry standards or special methods and <br />tests as prescribed in these specifications. <br />The contractor shall furnish such samples of materials as are requested by the Engineer, <br />without charge. No material shall be used until it has been approved by the Engineer. Samples <br />will be secured and tested whenever necessary to determine the quality of material. <br />S -4a <br />23A -67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.