Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />SECTION 4 - CONTROL OF MATERIALS <br />4 -1.3 Inspection Requirements <br />Add the following to this subsection: <br />At the option of the Engineer, the source of supply of each of the materials shall be approved <br />by the Engineer before delivery is started and before such material is used in the work. <br />Representative preliminary samples of the character and quality prescribed shall be submitted <br />by the contractor or producer of material to be used in the work, for testing or examination as <br />desired by the Engineer. All tests of industry materials furnished by the contractor shall be <br />made in accordance with commonly recognized industry standards or special methods and <br />tests as prescribed in these specifications. <br />The contractor shall furnish such samples of materials as are requested by the Engineer, <br />without charge. No material shall be used until it has been approved by the Engineer. Samples <br />will be secured and tested whenever necessary to determine the quality of material. <br />S -4a <br />23A -67 <br />