Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE 17TH STREET WATER MAIN IMPROVEMENTS <br />BRISTOL STREET TO BROADWAY <br />Construction Contract <br />Contract Administration <br />Inspection and Testing <br />Survey Staking <br />Contingencies (15 %) <br />TOTAL ESTIMATED DELIVERY COSTS <br />P &7z <br />$1,593,540 <br />$119,516 <br />$95,612 <br />$23,903 <br />$239,031 <br />2 071 60 <br />