My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />The Contractor shall provide and operate a self - loading motor sweeper with spray nozzles every <br />day, beginning 1/2 hour prior to the end of construction activities, for the purpose of keeping <br />the entire project site clean as acceptable to the City Engineer. <br />The contractor shall furnish and install all temporary piping, pump(s), valves and fittings <br />necessary to distribute the water where required for the control of dust as considered <br />necessary for the safety and convenience of the traveling public, for the reduction of dust <br />nuisance to adjacent property and for other purposes as directed by the Engineer. <br />The use of pressure pumps and spray bars on all sprinkling equipment used for the application <br />of dust palliative will be required. The use of gravity flow spray bars and splash plates will not <br />be permitted. <br />7 -8.2 AIR POLLUTION CONTROL <br />Add the following to this subsection: <br />All organic solvents used must comply with the rules, regulations and orders of the Southern <br />California Air Pollution Control District relating to organic solvents. <br />7 -8.4 STORAGE OF EQUIPMENT AND MATERIALS <br />Add the following to this subsection: <br />Storage of equipment and materials in the public right of way during non - working hours will not <br />be allowed, and may only be placed in the public right of way for purposes of use that day. <br />Overnight stockpiling of construction debris or excavated materials is not allowed. Contractor <br />must obtain written approval from the Engineer prior to storage of construction materials and <br />equipment on the street where improvements are planned, but at minimum, adequate flashing <br />barricades shall be provided. <br />No area is available within the contract limits for the exclusive use of the Contractor. However, <br />temporary storage of equipment and materials on City of Santa Ana property may be arranged <br />with the Engineer, subject to the prior demands of the City of Santa Ana. Use of the <br />Contractor's work areas and other City of Santa Ana -owned property shall be at the <br />Contractor's own risk, and the City of Santa Ana shall not be held liable for damage to or loss of <br />materials or equipment located within such areas. <br />The Contractor shall remove equipment, materials, and rubbish from the work areas and other <br />City of Santa Ana -owned property that the Contractor occupies at the conclusion of each <br />working day. <br />7 -8.6 WATER POLLUTION CONTROL <br />Add the following to this subsection: <br />S -7c <br />23A -73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.