My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />(b) The water pollution control practices deployed before the discharge event, or prior to <br />receiving the notice or order. <br />(c) The date of deployment and type of water pollution control practices deployed after the <br />discharge event, or after receiving the notice or order, including additional measures <br />installed or planned to reduce or prevent reoccurrence. <br />(d) An implementation and maintenance schedule for affected water pollution control <br />practices. <br />Compensation for conforming to these provisions shall be considered as included in the prices <br />paid for the various items of work and no additional compensation will be allowed therefor. <br />7 -10.1 ACCESS <br />Add the following to this subsection: <br />It shall be the Contractor's responsibility to furnish a detailed traffic control plan identifying the <br />maintenance of traffic during construction to the Engineer for approval. All traffic control plans <br />shall be submitted to the Engineer a minimum of 5 working days in advance of its planned <br />implementation for review and approval. <br />Signs, lights, flags, and other warning and safety devices and their use shall conform to the <br />requirements set forth in the current State of California Manual of Traffic Control for <br />Construction and Maintenance Work Zones. Construction area signs shall removed when no <br />longer required. <br />In the event that the Contractor fails to adequately provide for the public safety during the <br />course of construction under this contract, and the City is required to provide for said public <br />safety, the Contractor shall pay the City the cost of each service call, which will include all direct <br />labor and material costs including fringe benefits, overhead, and applicable rental rates for the <br />various pieces of equipment. Any and all costs incurred by the City as a result of the failure of <br />the Contractor to provide for the public safety will be deducted from the amount due to the <br />Contractor for the work done under this contract. <br />The Contractor may be required to cover certain signs during the progress of the work. Signs <br />that are no longer required or that convey inaccurate information to the public shall be <br />immediately covered. Covers for construction area signs shall be of sufficient size and density <br />to completely block out the complete face of the signs. The retroreflective face of the covered <br />signs shall not be visible either during the day or at night. Covers shall be fastened securely so <br />that the signs remain covered during inclement weather. Covers shall be replaced when they <br />no longer cover the signs properly. <br />If a closure is not reopened to public traffic by the specified time, Liquated Damages may apply <br />as specified above in Section 6 -9. <br />S -7f <br />23A -76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.