Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />TECHNICAL PROVISIONS <br />1.00 GENERAL <br />1.01 SCOPE OF WORK <br />The general nature of work consists of furnishing all labor, material, equipment, services, and <br />incidentals required for the installation of 12" water main and tie ins in Seventeenth Street <br />between Bristol Street and Broadway. Work includes water main installation, bore and jack, <br />constructing trenches, water service line installation, asphalt concrete pavement and concrete <br />gutters, cross - gutters, curb & gutter, sidewalks, and drive - approaches. Related work includes <br />mobilizing crews and equipment, implementing a construction safety plan, surveying, and <br />adjusting and utility covers, repainting traffic stripes and pavement markings, and placing <br />pavement markers, and all appurtenant work. <br />1.02 TIME OF COMPLETION <br />The Contractor shall complete all work under the contract and shall begin construction of the <br />project as stipulated in the Bid Proposal. <br />1.03 LIQUIDATED DAMAGES <br />The liquidated damages amount, in lieu of that specified in Subsection 6 -9 of the Standard <br />Specifications, shall be as stipulated in the Bid Proposal. <br />1.04 EMERGENCY INFORMATION <br />The names, addresses and telephone numbers of the Contractor and Subcontractors, or their <br />representatives, shall be filed with the Engineer and the City Police and County of Orange Fire <br />Departments prior to beginning work. <br />1.05 PLANS AND SPECIFICATIONS <br />This section shall conform to Section 2 -5 of the Standard Specifications and these Technical <br />Provisions. <br />The Contractor shall maintain a control set of plans and specifications on the project site at all <br />times. As approved by the Engineer, all final locations determined in the field and any <br />deviations from the plans and specifications shall be marked in red on this control set to show <br />the as -built conditions. Upon completion of all work, the Contractor shall submit the control <br />set to the Engineer. Final payment will not be made until this requirement is met. <br />T -la <br />23A -80 <br />