My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:00:25 PM
Creation date
11/26/2014 2:51:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO. 11 -6416 <br />SEVENTEENTH STREET WATER MAIN IMPROVEMENTS <br />1. Clearance between travel lane and open excavation is less than five (5) feet <br />2. Excavation depth is four (4) inches or deeper, and <br />3. If open excavation will last more than 24 hours <br />Payment for construction and maintaining temporary pavement shall be included in the price <br />bid for other items of work, and no additional compensation will be made therefore. <br />3.03 PERMANENT ASPHALT CONCRETE TRENCH PAVEMENT REPLACEMENT <br />This work shall consist of constructing permanent asphalt concrete pavement replacement <br />and shall be accomplished in accordance with the details shown on the Plans, these Technical <br />Provisions and the street work permit. <br />Asphalt concrete construction shall conform to Section 400, 200, 203, and 302 of the Standard <br />Specifications and these Technical Provisions. Tack coat is required. <br />Course aggregate shall consist of material, which at least 75% by weight shall be crushed <br />particles in lieu of the requirements of Section 400 -2.3. <br />The AC trench pavement replacement for each street shall consist of an AC base course and a <br />2" thick AC surface course. The AC trench pavement replacement shall be adjusted to match <br />existing street section listed below are recommendations: <br />Local Streets: 6" thick deep lift A.C. (match existing) <br />Arterial Streets: 12" thick deep lift A.C. (match existing) <br />The required AC mix designs shall be as follows: <br />Base Course III -B3 -AR -4000 or PG64 -10 <br />Overlay /Surface Course III -C3 -AR -4000 or PG64 -10 <br />Crack Filler III -F -AR -4000 or PG64 -10 <br />Payment for constructing permanent asphalt concrete replacement shall be included in the <br />unit price bid for other items of work and no additional compensation will be allowed <br />therefore. <br />3.04 PERMANENT PORTLAND CEMENT CONCRETE (P.C.C.) TRENCH PAVEMENT REPLACEMENT <br />AND BUS PAD REPLACEMENT <br />P.C.C. pavement replacement shall be at least 6 inches thick and shall be 1 inch thicker <br />than existing. P.C.C. <br />T -3c <br />23A -98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.