My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
25C - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:36:02 PM
Creation date
11/26/2014 3:31:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I @ <br />" kl Fairview Street Bridge Rehabilitation <br />RFP No. 14-001 <br />Exist <br />� 18 ' n'2' 12' 11' | 11' 11' I5.| 0.5' <br />STAGE 1 <br />{}oGvn2~M/estsideRohab//itat/onVMden/ngStage7/Mainta/n°ast3'^0'shnp/dorx/h//eweots/de <br />superstructure isconstructed. <br />Option 2~VMos$kda Rehabilitation Widening Stage 2: Open new west sidewalk and construct east sidewalk. <br />Note the debris wall remains untouched. <br />FUTURE <br />Option 2 - Ultima te 6-Lane Wdening to the East: Shift centerline 5'-0" east and re-con5truct debris wall, <br />go Rehabilitation Understanding of Need I E <br />
The URL can be used to link to this page
Your browser does not support the video tag.