My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
25C - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:36:02 PM
Creation date
11/26/2014 3:31:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lc Fairview Street Bridge Rehabilitation <br />RFP No. 14 -001 <br />The proposed widening does increase capacity <br />on the bridge; therefore, a Noise Study Report <br />and Air Quality Analysis/ Air Quality Conformity <br />documentation will not be required. In addition, it is <br />anticipated that the project footprint will be within <br />City right of way; therefore, no potential historical <br />resources will be within the Area of Potential Effects <br />(APE) and a Historical Resources Evaluation Report <br />will not be required, nor will a community impact <br />or relocation impact document be required. Last, <br />based on our review and preliminary completion of <br />the Caltrans Questionnaire for Visual Impacts, no <br />visual report or memo will be required. <br />BIOLOGICAL RESOURCES AND <br />JURISDICTIONAL WATERS PERMITS. <br />The project area is built out and the Santa Ana River <br />is lined with concrete in this area; therefore, there <br />is limited suitable habitat for special status species. <br />However, bridge structures are often used by bats <br />for roosting and nesting, so a bat habitat suitability <br />assessment will be conducted by a qualified bat <br />biologist. This assessment will be incorporated into <br />the Natural Environment Study (Minimal Impacts) <br />(NESMI) for the project. <br />for mitigation banks and in lieu fee mitigation over <br />permittee responsible mitigation, and the project <br />area is within the Current service area for some of <br />these options. <br />Anyrequired mitigation will meetthe requirementsof <br />the Section 1602 Streambed Alteration Agreement <br />from the California Department of Fish and Game <br />(CDFW), the Section 401 Clean Water Act (CWA) <br />Water Quality Certification from the Regional Water <br />Quality Control Board (RWQCB) and the Section <br />404 CWA permit authorization from the USACE. <br />Separate permit authorizations from USACE, <br />RWQCB, and CDFW will be required to conduct <br />gectechnical borings in the Santa Ana River. LSA will <br />process these permits in coordination with the City. <br />SECTION 4(%) AND CH. <br />Caltrans /FHWA has previously determined that the <br />Santa Ana River Trail (SARI) is subject to evaluation <br />under Section 4(f) of the Transportation Act because <br />it is a recreation area of regional significance, <br />During construction, the portion of the SART that <br />passes below the existing bridge may need to be <br />if-E, Design Services for raiiVew Street Bridge Rehmblllt -ation Understanding of Need 119 <br />25C -25 <br />closed, restricted, or detoured. Similar impacts <br />Fairview Street bridge passes over the Santa <br />have been documented by LSA for several bridge <br />Ana River, a tributary to <br />projects, including the <br />navigable waters of the U.S. <br />recently completed First <br />Therefore, a Jurisdictional <br />Street Bridge project <br />Delineation will be necessary <br />in Santa Ana. LSA has <br />to determine -the limits of the <br />facilitated consultation <br />waters of the United States <br />between Caltrans, <br />and State jurisdictional <br />1111 <br />cities and county <br />streambed within the project <br />parks departments as <br />limits. Because the Santa <br />required under Section <br />Ana River is completely <br />4(f). This process will <br />concrete -lined in the project <br />also be applicable to the <br />area, it is expected that no <br />proposed project, <br />mitigationwill berequiredfor Newly constructed Fair,i;ew Triangle Habitat <br />impacts to the river (bridge Restoration ,$ adjacent to so- uthwest ap,oroach The City received a <br />abutments and pilings). However, if mitigation is <br />Recreational Trails Program grant from FHWA and <br />required, LSA will work with applicants and the <br />the California Department of Parks and Recreation <br />USACE to identify an appropriate mitigation ratio <br />and improved Fairview Triangle into a trailside rest <br />and mitigation bank or in lieu fee option, instead of a <br />area with landscaping, seating, and interpretive <br />comprehensive mitigation and monitoring plan. The <br />signage. Through consultation with the City, it will <br />2008 USACE Mitigation Rule expresses a preference <br />be confirmed whether or not this site is subject <br />if-E, Design Services for raiiVew Street Bridge Rehmblllt -ation Understanding of Need 119 <br />25C -25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.