Fairview Street Bridge Rehabilitation <br />WKE Team is ready to serve the City of Santa Ana and work <br />actively to implement the safety improvement project for <br />Fairview Bridge over Santa Ana River. Presented below <br />is an anticipated design and construction schedule for <br />the bridge and roadway improvements. The schedule <br />refectsthe schedule compression strategies that we have <br />used effectively on other projects in order to accelerate <br />the design development. WKE will complete preliminary <br />engineering phase five months after NTP. We anticipate <br />the project will clear with CE /CE for NEPA and CEQA. <br />We propose to begin engineering work concurrently <br />City of San. Dimas <br />245 East Bonita Avenue <br />San Dimas, CA 91773 <br />(909) 394 —6245 <br />Foothill Boulevard over <br />San Dimas Wash Los Angeles River <br />Avenue 19 over Arroyo Seco <br />before final approval of the Environmental Documents. <br />To eliminate risk to change in scope, the main design <br />work will not begin until the technical studies have <br />been completed. This strategy will allow final PS &E <br />be completed by February 2016, and contract bid and <br />award by early December 2016. The 24 month schedule <br />allows 3 months for Construction E -76, and 4 months <br />for bid and award. The construction will begin in the <br />beginning of 2017. This will provide ample cushion for <br />the contractor to begin construction in the river by April <br />2017, and complete the bridge project by end of 2017. <br />City of Los Angeles. ; <br />Caltrans District 7 <br />1149 South Broadway; #750 <br />100 South Main Street <br />Los Angeles, CA 90015 <br />Los Angeles; CA 90012 <br />(213)847 -- 5b25 <br />(213) 897.- 6926 <br />t„ kn Iennalnr•ity nrw <br />iinwaniit nalaha@dot.ca.aov <br />First Street over . <br />SR- 57 /SR -60 Confluence <br />,A IZ E Design Services for Gnirvlew Street Bridge Rehabilitation Schedule & Referents 130 <br />25C -32 <br />