My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
25C - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:36:02 PM
Creation date
11/26/2014 3:31:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 10 -H COST PROPOSAL <br />Consultant: Civil Works Engineers Contract No.: 14 -011 Date: 1017/2014 <br />DIRECT LABOR <br />ClessiflcatlonRitle <br />Name <br />Hours <br />Actual Hourly Rate <br />Total <br />Principal In Charge <br />Marla Marston <br />51 <br />$72.00 <br />$3,672.00 <br />Drainage Engineer <br />Francois Zugmeyer <br />178 <br />$53.50 <br />$9,523.00 <br />Roadway Engineer <br />David Grantham <br />66 <br />$49.00 <br />$3,332.00 <br />Junior Engineer <br />Lander Phan <br />148 <br />$36,50 <br />$5,402.00 <br />Clerical <br />Clark Pilcher <br />8 <br />$2650 <br />$212.00 <br />$0,00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />LABOR COSTS <br />a) Subtotal of Direct Labor Costs <br />b) Anticipated Salary Increases (3 % /yr, 5 year duration) <br />FRINGE BENEFITS <br />d) Fringe Benefits (Rate: 20% <br />INDIRECT COSTS <br />0 Overhead (Rate: 120 %) <br />h) General and Administrative (Rate: 0 %) <br />FIXED FEE (Profit) <br />(Rate: to %) <br />OTHER DIRECT COSTS (ODC) <br />1) Travel /Mlleege Coate <br />m) Equipment Rental and Supplies (Including Mailing and Reproductions) <br />n) Permit Fees <br />o) Subcansultant Costs <br />LPP 13 -01 <br />$22,141.00 <br />$70300 <br />c) TOTAL DIRECT LABOR COSTS $22,844.00 <br />e) TOTAL FRINGE BENEFITS $4,568.80 <br />g) Overhead $27,413 <br />1) Gen and Admin $0 <br />J) TOTAL INDIRECT COSTS $27,413 <br />k) TOTAL PROFIT $5,483 <br />$200 <br />$350 <br />$0 <br />$0 <br />p) TOTAL OTHER DIRECT COSTS $550 <br />TOTAL COST $60,858 <br />25C -53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.