My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
25C - AGMT - ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 3:36:02 PM
Creation date
11/26/2014 3:31:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
12/2/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 10 -H COST PROPOSAL <br />Consultant: Earth Mechanics, Inc. Contract No.: 14 -011 Date: 10/7)201 <br />4 <br />DIRECT LABOR <br />Class lticallonri'lle <br />Name <br />Hours <br />Actual Hourly Rate <br />Total <br />Project Manager <br />110 <br />$76.50 <br />$8,415.00 <br />QArQC Engineer <br />20 <br />$76,50 <br />$1,530.00 <br />Senior Project Engineer <br />216 <br />$43.50 <br />$9,396.00 <br />Senior Staff Geologist <br />70 <br />$32.50 <br />$2,275.00 <br />Staff Engineer <br />52 <br />$26.60 <br />$1,383,20 <br />Soil Tech. <br />78 <br />$32,00 <br />$2,496.00 <br />Cledoai <br />2 <br />$16.15 <br />$32.30 <br />$0.00 <br />$0.00 <br />$0,00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />LABOR COSTS <br />a) Subtotal of Direct Labor Costs <br />b) Anticipated Salary Increases (3 %/yr, 5 year duration) <br />FRINGE BENEFITS <br />d) Fringe Benefits (Rate: 24%) <br />INDIRECT COSTS <br />f) Overhead (Rate: 148,42 %) <br />h) General and Adminlatrative (Rate: 0 %) <br />FIXED FEE (profit) <br />(Rate: 10 %) <br />OTHER DIRECT COSTS (ODC) <br />1) Travel /Mileage Coats <br />rn) Equipment Rental and Supplies (Including Malting and Reproductions) <br />n) Penult Fees <br />0) Subconsullant Costs <br />LPP 13 -01 <br />$25,527.50 <br />$709.50 <br />c) TOTAL DIRECT LABOR COSTS $26,297.00 <br />a) TOTAL FRINGE BENEFITS $6,311.28 <br />g) Overhead $39,030 <br />1) Gen and Admin $0 <br />I) TOTAL INDIRECT COSTS $39,030 <br />k) TOTAL PROFIT $7,164 <br />$150 <br />$17,695 <br />$0 <br />$0 <br />P) TOTAL OTHER DIRECT COSTS $17,845 <br />TOTAL COST $96,647 <br />25C -55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.