Laserfiche WebLink
City of Santa Ana, CA I WATER RATE STUDY <br />Figure B - 12: Map Showing Water Mains and Breaks based on Pipe Material (All Pipe Materials) <br />r <br />0 <br />3,000 6,000 12,000 Ft s <br />Breaks by Pipe Material Water Main by Material <br />• <br />Asbestos Concrete <br />— Asbestos Concrete <br />f <br />Cast Iron <br />— CML &C <br />© <br />CMLC <br />— Cast Iron <br />• <br />Cylinder <br />— Cylinder <br />B <br />Ductll Iron <br />— Duchl Iron <br />• <br />Polyvinyl Chloride <br />— Polyvinyl Chloride <br />• <br />Unknown <br />— Steel <br />— Unknown <br />I =; City Boundary <br />— RailRoads <br />BLACK & VEATCH I Appendix B: Water CIP Prioritization P .-oces <br />65B -105 <br />>_ e <br />City of Santa Ana, CA <br />Water I Wastewater <br />System Analysis - 2012 <br />Al <br />Water Distribution System <br />Breaks by Pipe Material-All <br />BLACK &VEATCH <br />Building a world of difference.- <br />