Laserfiche WebLink
City of Santa Ana, CAI i ::. 3 f U ur <br />Figure B- <br />33: Water System BRE Heat Map Graphic by Miles of Main <br />Probability of Failure <br />1 2 3 4 5 6 7 <br />8 9 <br />10 <br />10 0.3 -, i! 11.7 <br />2.1 <br />5.8 <br />4J <br />-� <br />L <br />9 0.1 1.9 <br />23 <br />3 <br />•� <br />8 0.5 1.4 <br />2.7 j� 0. <br />2.3 <br />M <br />4- <br />7 0.1 1.3 <br />2.7 <br />2.8 <br />1.4 <br />1.5 <br />O <br />4) <br />6 2.8 <br />7.5 <br />4.2 <br />1.1 <br />W <br />J2.2 <br />5 2.9 <br />1.0 <br />8.3 <br />1.3 <br />7.4 5.4 <br />1.7 <br />4 9.2 <br />5.8 <br />27.9 3.4 <br />- 22.4 10.7 <br />6.0 <br />C <br />3 2.3 1.4 <br />2.1 <br />12.0 0.6 2.7 1.7 <br />2.3 <br />O <br />V <br />2 21.6 14.1 <br />8.5 <br />j..2 7.2 19.9 10.6 <br />6.5 <br />1.9 <br />2.7 <br />1 1.0 3.5 <br />5.4 <br />_ A.5 14.5 32. 27.9 <br />15.9 2.4 <br />1.8 <br />Miles <br />Total Miles: <br />507.8 <br />Most of the pipe segments that fell into the upper right most corner cell were the 36 inch high <br />pressure <br />MWD transmission main that the City already had concerns about. These assets <br />had PoF and CoF scores <br />of 10 each; with a combined BRIE score of 100. <br />[SPACE INTENTIONALLY LEFT BLANK] <br />BLACK & VEATCH I Appendix B: Water OF Prioritization Proses t 21 <br />65B -133 <br />