My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - PROPOSED WATER AND SEWER RATE ADJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
65B - PROPOSED WATER AND SEWER RATE ADJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2014 8:46:02 AM
Creation date
11/26/2014 3:35:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65B
Date
12/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
124 <br />WATER RATE STUDY I City of Santa Ana, CA <br />INTRODUCTION <br />The final step in this assessment process is to calculate the overall inspection and replacement cost for <br />each asset. The inspection costs were calculated at $150,000 per mile for all pipe diameters. Average <br />facility replacement cost look -up tables were used to determine overall budgetary estimates and <br />schedules (see Table C - 1 below). Construction cost (2012 dollars) values were based on an informal <br />survey of Southern California utilities in recent years, and inspection costs were based on estimates <br />from nation -wide projects. Specific cost estimates based on experience in Santa Ana were not available <br />at the time of printing. Replacement costs were not specific to pipe material, and replacement was <br />assumed to be the same diameter. Pipe segments with a diameter of 0 or unknown were replaced with <br />a 6 inch pipe. Costs also assume basic construction practices, including imported sand bedding and <br />backfill, compaction, pavement removal, hauling, shoring, trench excavation, testing and disinfection. <br />Table C -1: Water Pipe Replacement Costs (2012 dollars) <br />2 <br />$282.72 <br />18 <br />$435.57 <br />4 <br />$301.82 <br />20 <br />$454.68 <br />6 <br />$320.93 <br />24 <br />$492.89 <br />8 <br />$340.04 <br />30 <br />$550.21 <br />10 <br />$359.14 <br />36 <br />$607.53 <br />12 <br />$378.25 <br />48 <br />$722.17 <br />14 <br />$397.36 <br />54 <br />$779.49 <br />16 $416.46 78. $1,008.77 <br />Figure C - 1 shows the distribution of BRE scores (across the bottom) against the total estimated <br />replacement costs. The cumulative replacement cost line is also provided. It must be emphasized that <br />BRE scores calculated in this study were based on relative values and do not represent an absolute level <br />of risk. As such, it is not possible to quantitatively determine an acceptable BRE target. As the City <br />collects additional condition and failure information, further investigation is recommended to better <br />characterize the risk relationship and define appropriate targets. <br />65B -136 <br />NOVEMBER 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.