Laserfiche WebLink
City of Santa Ana, CA I WATER RATE STUD`! <br />review of the results. It is intended to be a composite cost of the technologies and methods that <br />would be recommended. <br />Replacement /Rehabilitation Recommendations <br />• No pipes are recommended for immediate replacement or rehabilitation because data was not <br />sufficient to make that determination. Instead, assessments are recommended, and a <br />replacement /rehabilitation program would be prepared based on the assessments. <br />• Replacements have been budgeted for the CIP based on assumptions about the fraction of pipe <br />in each risk grouping that would need to be replaced. There is considerable uncertainty in these <br />assumptions, and while we attempted to be conservative (but not overly conservative) in our <br />assumptions, little is known about the actual condition of the pipes to be inspected, so the <br />anticipated costs may change significantly. <br />WATER SYSTEM CAPITAL IMPROVEMENTS PROGRAM <br />Based on the proposed strategy presented above and the CAMPS analysis for non - distribution system <br />assets, Table C - 4 presents the resulting capital improvements program costs. <br />Table C -4: Water System Capital Improvements Program ["] <br />MW� ®® <br />1 $400,000 $1,301,000 $1,413,000 <br />$1,007,300 $1,153,300 $717,100 $5,991,700 <br />2 $4,342,500 $1,455,400 $1,930,200 $1,223,100 $1,876,900 $10,828,100 <br />3 $1,116,100 $4,472,800 $1,499,100 $1,970,500 $2,203,000 $1,471,800 $12,733,300 <br />4 $5,740,100 $1,544,000 $2,752,000 $7,439,100 $2,020,100 $19,495,300 <br />5 $5,912,300 $1,590,300 $2,809,500 $2,596,800 $2,727,800 $15,636,700 <br />*Costs have been escalated to the year of R &R, using a 3% escalation from FY2013 <br />BLACK & VEATCH I Appendix C Replacement Cost Calculation All Assets within City Service Area <br />65B -147 <br />135 <br />