Laserfiche WebLink
City of Santa Ana, CA I WATER RATE STUDY <br />R &R Strategy Groups and CIP Budgeting <br />The risk prioritization table just presented identifies pipe segments having the highest BRE score. Since <br />this score is based on the product of PoF times CoF factors, it gives equal consideration for both factors. <br />Typically, different R &R strategies are applied to address these two considerations. <br />Based on the BRE heat map graphic results, the ranked assets were then grouped into logical R &R <br />strategies. Figure D - 5 shows the same BRE heat map graphic as before, but color coded by strategy <br />group. Figure D - 6 shows a map of the City -owned mains color -coded by Strategy Group (A -Z). Table D - <br />2 defines each of these groupings and provides additional summarizations and recommendations. <br />Figure D - 5: BRE Heat Map Graphic by Cost and R &R Strategy Groups for City -owned Mains <br />30 <br />L <br />9 <br />FO 8 <br />LL <br />O 7 <br />y 6 <br />U <br />C 5 <br />3 4 <br />Cr <br />OJ 3 <br />N <br />= 2 <br />O <br />U 1 <br />Probability of Failure <br />1 2 3 4 5 6 7 8 9 10 Group <br />.3 $2. ° <br />$6.1 <br />$0°{2 <br />$00' <br />$0.0 <br />$0.0 <br />$0.0 <br />$01 <br />$0.0 <br />$0.6 <br />B <br />$0.4 <br />$0.1 <br />$0.0 <br />$0.0 <br />$1.9 <br />$U <br />$0.7 <br />C <br />$0.3 <br />$2.3 <br />$6.1 <br />$6.4 <br />$0.1 <br />$0.0 <br />$0.0 <br />$0.0 <br />$0.0 <br />$3.3 <br />D <br />$1.1 <br />$4.6 <br />$16.4 <br />$9.2 <br />$0.2 <br />a <br />0 <br />$0.9 <br />$0.0 <br />$0.5 <br />E <br />$4.3 <br />$3.0 <br />$2.1 <br />$16.9 <br />$2.5 <br />$14.8 <br />$10.9 <br />$3.4 <br />$0.0 <br />$0.8 <br />F <br />$20.9 <br />$17.5 <br />$11.7 <br />$55.7 <br />$6.7 <br />$44.8 <br />$21.3 <br />$10.9 <br />$0.9 <br />$5.4 <br />$4.1 <br />$1.9 <br />$3.9 <br />$22.0 <br />$1.2 <br />$4.8 <br />$3.1 <br />$4.2 <br />$0.9 <br />$0.9 <br />l <br />$38.7 <br />$25.1 <br />$15.3 <br />$91.4 <br />$12.8 <br />$35.5 <br />$18.9 <br />$11.5 <br />$3.4 <br />$4.9 <br />y <br />$1.7 <br />$6.0 <br />1 $9.2 <br />$75.2 <br />$24.5 <br />$54.3 <br />$47.4 <br />$26.8 <br />$4.0 <br />$3.0 <br />2 <br />Millions of Dollars <br />Total Cost: $888.8 <br />BLACK & VEATCH I Appendix R Cary -Owned Malns Analvs�, <br />65B -155 <br />