Laserfiche WebLink
SEWER RATE STUDY I City of Santa Ana, CA <br />Introduction <br />This report was prepared for the City of Santa Ana (City) to document a multi -year financial plan, the <br />cost of service analysis and the design of a rate structure for the City's Sewer Enterprise. The specific <br />goals of the study were to: <br />• Review and evaluate existing policies and procedures affecting utility rates; <br />• Evaluate the adequacy of projected revenues under existing rates to meet projected revenue <br />requirements; <br />• Develop a Rehabilitation and Replacement (R &R) Program that will identify major capital <br />expenditures for the Sewer system; <br />• Create a sound financial plan for the Sewer Enterprise covering a five -year study period for both <br />ongoing operations and planned capital improvements; <br />• Allocate projected Fiscal Year (FY) revenue requirements to the various customer class in <br />accordance with the respective service requirements; and <br />• Develop a suitable rate schedule that produces revenues adequate to meet financial needs <br />while recognizing customer costs of service and local and state policy considerations such as <br />Proposition 218 and Senate Bill x7 -7 (S130-7). <br />BACKGROUND <br />The City of Santa Ana is one of the oldest Cities in Orange County incorporated in 1886. It encompasses <br />27.5 square miles and is located approximately 35 miles southeast of downtown Los Angeles. The City is <br />the governmental center of Orange County with a population of roughly 324,500 (2010 US Census). The <br />City owns and operates through the Department of Public Works two self- supporting enterprises: Water <br />and Sewer. <br />The Sewer Enterprise serves its customers by providing wastewater collection only services. The Sewer <br />Enterprise owns and maintains a citywide collection system to collect and transport all sanitary flow to <br />the Orange County Sanitation District (OCSD) treatment facility, located in Fountain Valley. City <br />customers pay for treatment services directly to OCSD on the property tax roll. The City wastewater <br />collection system is composed of 390 mile of collection mains, including 20 miles of OCSD -owned but <br />City maintained trunk sewer mains, 8,000 manholes, 2 lift stations and other miscellaneous structures. <br />PURPOSE <br />The purpose of this report is to present the findings obtained from Black & Veatch Corporation's (Black <br />& Veatch's) study of Sewers rate structure and alternatives, financing, and capital needs. Black & <br />Veatch assessed the system's capital needs based on the R &R Program evaluation as well as additional <br />reviews of planned system improvements. The study develops a financial plan that projects operating <br />revenue, expenses and capital financing costs for the City's Enterprise Funds over a five -year planning <br />period ending June 30, 2019. As part of the plan, future revenues under existing rates, operation and <br />maintenance expense, principal and interest expense on bonded debt, and capital improvement <br />requirements are considered. Historical data trends served as the basis for annual projections of <br />customers, water use, revenues, and expenditures for the next five years. <br />18 <br />65B -177 <br />NOVEMBER 2014 <br />