My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - PROPOSED WATER AND SEWER RATE ADJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
65B - PROPOSED WATER AND SEWER RATE ADJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2014 8:46:02 AM
Creation date
11/26/2014 3:35:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65B
Date
12/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64 <br />SEWER RATE STUDY I City of Santa Ana, CA <br />Table A 10 summarizes the total funding needs identified during the 30 -year model period by <br />infrastructure group based on available information. <br />Table A - 30: Total Modeled R &R 30 Year Costs <br />Sewer Sewer $1,337,400 <br />Sewer Mains and Lift <br />Stations $118,765,100 <br />Total Sewer System $120,102,500 <br />*Costs have been escalated to the year of R &R, using a 3% escalation from FY2013 <br />As identified above, each system has a unique profile of Capital Asset R &R needs that is dependent on <br />overall age of the infrastructure, type of infrastructure assets (predominantly short or long asset lives), <br />and detailed asset knowledge as determined through inspections. Figure A 2 illustrates this unique <br />profile for the Sewer system. <br />Figure A- 2: Annual Capital Asset R &R Needs for the Sewer System <br />*Costs have been escalated to the year of R &R, using a 3% escalation from FY2013 <br />As discussed earlier, R &R schedules derived using depreciation methodologies are a good tool when <br />condition assessment data is not available. For the City, some information for sewer mains exist and as <br />such, Black & Veatch made refinements to the schedules proposed above. R &R projections for all other <br />assets remain until the City has completed its condition assessment work for aboveground assets. <br />65B -223 <br />NOVEMBER 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.