Laserfiche WebLink
SEWER RATE STUDY I City of Santa Ana, CA <br />Figure B- 28: Map of Sewer Mains Color -Coded by CoF Scores <br />rtr <br />0 3.000 6,000 12,000 Ft <br />Sewer Main-CoF Score <br />9 and <= 10 <br />>8 and = =9 <br />7 and < =8 <br />»-- >6 and < =7 <br />>5 and < =6 <br /><= 5 <br />! City Boundary <br />- -- RailRoads <br />r <br />j <br />r <br />i <br />i <br />r <br />s <br />City of Santa Ana, CA <br />Water / Wastewater <br />System Analysis - 2012 <br />tsl h <br />Sewer Collection System <br />Mains by CoF Score <br />0 BLACK &VEATCH <br />Building ♦ world of difference.- <br />102 NOVEMBER 2014 <br />65B -261 <br />