My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - PROPOSED WATER AND SEWER RATE ADJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
65B - PROPOSED WATER AND SEWER RATE ADJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2014 8:46:02 AM
Creation date
11/26/2014 3:35:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65B
Date
12/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, CA I SEWER FRIATE STUDY <br />OBJECT SIZE I YEAR LENGTH COHORT POF COF ESTIMATED <br />RANK I ID MATERIAL I (IN) INSTALLED DECADE (MILES) RANK SCORE SCORE BRE COST <br />96 <br />1437 <br />VCP <br />30 <br />1969 <br />1960s <br />0.06 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$135,702 <br />97 <br />1438 <br />VCP <br />30 <br />1969 <br />1960s <br />0.03 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$66,034 <br />98 <br />1439 <br />VCP <br />27 <br />1969 <br />1960s <br />0.13 <br />3 <br />6.0 <br />8:4 <br />50.2 <br />$251,067 <br />99 <br />1557 <br />VCP <br />24 <br />1952 <br />1950s <br />0.08 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$137,824 <br />100 <br />5745 <br />VCP <br />8 <br />1927 <br />1930 Pre <br />0.01 <br />5 <br />10.0 <br />5.0 <br />50.4 <br />$10,068 <br />101 <br />1558 <br />VCP <br />24 <br />1952 <br />19505 <br />0.04 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$74,499 <br />102 <br />1645 <br />VCP <br />30 <br />1952 <br />1950s <br />0.08 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$170,602 <br />103 <br />3664 <br />PCC <br />48 <br />1958 <br />19505 <br />0.24 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$737,399 <br />104 <br />6644 <br />VCP <br />33 <br />1952 <br />1950s <br />0.17 <br />3 <br />6,0 <br />8.4 <br />50.2 <br />$376,578 <br />105 <br />7805 <br />VCP <br />24 <br />1952 <br />1950s <br />0.01 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$24,720 <br />106 <br />7812 <br />VCP <br />24 <br />1952 <br />1950s <br />0.01 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$20,281 <br />107 <br />7979 <br />VCP <br />33 <br />1952 <br />19505 <br />0.12 <br />3 <br />6.0 <br />8.4 <br />50.2 <br />$265,940 <br />R &R STRATEGY GROUPS AND CIP BUDGETING <br />The risk prioritization table just presented identifies pipe segments having the highest BRE score. Since <br />this score is based on the product of PoF times CoF factors, it gives equal consideration for both factors. <br />Typically, different R &R strategies are applied to address these two considerations. <br />Based on the BRE heat map graphic results, the ranked sewer main assets were then grouped into <br />logical R &R strategies. Table C 3 defines each of these groupings and provides additional <br />summarizations and recommendations. Figure C 3 shows the same BRE heat map graphic as before, but <br />color coded by strategy group. Figure C 4 presents a map of pipe segments color coded by these strategy <br />groups. <br />[INTENTIONALLY LEFT BLANK] <br />BLACK & VEATCH I Appendix C Inspection and Replacement Cost Calculation <br />65B -272 <br />
The URL can be used to link to this page
Your browser does not support the video tag.