My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - PROPOSED WATER AND SEWER RATE ADJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
65B - PROPOSED WATER AND SEWER RATE ADJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2014 8:46:02 AM
Creation date
11/26/2014 3:35:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65B
Date
12/2/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, CA I WATER RATE STUDY <br />Table A - 8: Misc. Assets Replacement Costs — 2012 dollars <br />Gen Set Plug $11,300 <br />Refurbishment Intervals and Schedule <br />Capital refurbishment activities were identified for specific assets where major (non - operational /annual) <br />expenditures would be required to maintain the intended useful life of the asset. For each of these <br />refurbishments, defined intervals and costs were developed for specific asset classes, as presented in <br />Table A - 9. <br />Table A - 9: Assets Refurbishment Intervals and Costs— 2012 dollars <br />BLACK & VEATCH I Appendix A. Rerurbishment & Repia 7I <br />65B -83 <br />Minor refurbishment (paint <br />ELEV_TANK Elevated Tank <br />10 5% <br />and repairs) <br />MWD <br />Major refurbishment (valves, <br />MOD <br />20 30% <br />Connection <br />gaskets, misc. piping, controls) <br />Pressure <br />Major refurbishment (valves, <br />PRV <br />20 30% <br />Reducing Vault <br />gaskets, misc. piping, controls) <br />BLACK & VEATCH I Appendix A. Rerurbishment & Repia 7I <br />65B -83 <br />Major refurbishment (seal <br />replacement, bearing <br />PUMP_W <br />Pump (Water) <br />replacement, shaft sleeve <br />5 <br />30% <br />repair, rewind, varnish and <br />bake, etc.) <br />Major refurbishment (seal <br />replacement, bearing <br />Submersible <br />PUMPS W <br />replacement, shaft sleeve <br />5 <br />30% <br />— <br />Pump (Water) <br />repair, rewind, varnish and <br />bake, etc.) <br />RESV <br />Reservoir <br />Exterior painting, grouting <br />5 <br />5% <br />Piping, valves and other <br />RESV <br />Reservoir <br />30 <br />10% <br />appurtenances <br />Misc. rehabilitation (e.g„ <br />STRN <br />Structure <br />15 <br />10% <br />paint, fix up stucco, etc.) <br />BLACK & VEATCH I Appendix A. Rerurbishment & Repia 7I <br />65B -83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.