Laserfiche WebLink
City of Santa Ana, CA <br />Figure B - 1: Example Risk Heat Map Graph Relating PoF and CoF Scores. <br />10 <br />C, <br />v <br />3 8 <br />LL 7 <br />W <br />0 6 <br />v <br />V <br />v 5 <br />3 <br />v 4 <br />c <br />v 0 3 <br />F] <br />1 <br />Probability of Failure <br />1 2 3 4 5 6 7 8 9 10 <br />GENERAL ASSUMPTIONS AND OBSERVATIONS <br />During the source data review, condition assessment and planning analysis, various assumptions were <br />made to permit further evaluation. Many of these were necessary due to limitations in the existing data <br />such as missing or conflicting pipe attributes, limited inspection data, or similar constraints. for <br />example, the timing of pipeline lining is often unclear. The association of water break data to the correct <br />asset was also not precise. Although good engineering judgment was used in the analysis of historic <br />pipeline condition data, an unknown level of inaccuracy exists. Due to the limited quantity and quality of <br />source data, further investigation is recommended before making specific rehabilitation or replacement <br />decisions. <br />The following list includes many of the general assumptions and observations made during the planning <br />assessment on the water outside -plant network system. Additional comments are included in specific <br />sections of this document. <br />• Only water mains were considered in this assessment. The condition of pump stations, service <br />laterals, reservoirs, etc. were not addressed. <br />• Pipeline Type = "PRIV" or "ABAN" were omitted from the water analysis. <br />• Pipe segments with zero length were omitted from the analysis. <br />• The timing of pipeline lining is often unclear. Therefore, it was assumed that any inspection data <br />referred to the pipe conditions prior to lining. Once lined, the pipe was assumed to have been <br />"fixed" and currently be in very good structure condition. <br />• Based on the GIS source data provided, it appears that zero water or sewer pipe was installed in <br />2010; even though 47 water main breaks occurred that year. <br />BLACK & VEATCH I Appendix B'. Water CIP Prlerltizanon Process <br />65B -91 <br />79 <br />