My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PPT_65B_WATER SEWER RATE STUDIES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
PPT_65B_WATER SEWER RATE STUDIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2014 8:14:59 AM
Creation date
12/2/2014 8:14:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Date
12/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED WATER CIP <br />2.8% annual increases provides: <br />• <br />CIP of $67.8M over 5 years <br />– <br />Elimination of main replacement backlog <br />– <br />3 miles per year replacement <br />– <br />Rehab of Well 32 (currently offline) will increase local supply <br />– <br />Requires debt financing of $24M and cash financing of <br />• <br />$35M (from revenue adjustments <br />) <br />In $000’s <br />ProjectFY 14/15FY 15/16FY 16/17FY 17/18FY 18/19 <br />AMI3,278.23,376.53,477.83,582.2 <br />Well 32 Rehab <br />5,177.3 <br />R&R -Annual <br />5,352.55,057.25,208.8 <br />Inspections <br />314.81,300.6 <br />R&R -Critical <br />10,462.23,299.44,505.54,640.78,738.8 <br />Total <br />$10,462.2$12,244.9$13,059.3$14,476.3$17,529.8 <br />AMI = Advanced Metering Infrastructure R&R = Rehabilitation and Replacement <br />15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.