My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - SANTA ANA GRADE SEPARATION PROJECT_Exhibit 2 in Color
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
19E - SANTA ANA GRADE SEPARATION PROJECT_Exhibit 2 in Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:13:58 PM
Creation date
12/3/2014 4:08:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
12/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Blvd. Grade Separation <br />8" water lines: Two 8" waterlines are identified within the proposed project area. Both <br />are fed from the 12" waterline along the Santa Ana Boulevard. The first waterline flows <br />northerly along Logan Street north of the Santa Ana Boulevard, the second one runs <br />southerly along Fuller Street from the 20" waterline in Santa Ana Boulevard until it ties <br />into the 8" waterline on Fruit Street. <br />6" waterline: A 6" waterlines have been identified in the north -south direction just west <br />of the railroad. The waterline is also connected to the waterline underneath Santa Ana <br />Boulevard. The waterline continues to the north underneath Lincoln Avenue. <br />20" waterline: A 20" waterline is located under Fuller Street that extends north from <br />Santa Ana Boulevard. <br />Sewer: City of Santa Ana sewers are generally running in the north -south direction and <br />are connected to the Orange County Sanitation District (OCSD) sewer main underneath <br />Fruit Street. They are summarized as follows: <br />Santiago Street 8" <br />Logan Street 6" <br />Lincoln Avenue/Railroad 6" <br />Fuller Street 611/8" <br />Orange County Sanitation District (OCSD): <br />18" sewer trunk main: The 18" sewer runs in the east -west direction underneath Fruit <br />Street. The sewer line continues to the east passing under the SARTC parking area and <br />under Santa Ana Boulevard east of Santiago Street. <br />Southern California Gas (SCG): <br />With the exception of a short segment between Santiago Street and Logan Street, all <br />SCG gas lines are limited to side streets. The locations of existing gas lines are <br />summarized as follows: <br />Santa Ana Boulevard 4" (between Santiago Street and Logan Street) <br />Logan Street 2" <br />Lincoln Avenue/Railroad 2" <br />Fuller Street 2" (north of Santa Ana Boulevard) <br />Fruit Street 3" <br />Southern California Edison (SCE): <br />Underground cables: Underground cables are identified along the south side of Santa <br />Ana Boulevard, west side of Lincoln Avenue, and west side of Fuller Street within the <br />project area. Some underground SCE facilities can also be found on the north side of the <br />Santa Ana Boulevard between Santiago Street and Fuller Street. <br />Aerial Facilities: Power poles and aerial wires are found along the east side of Fuller <br />and north side of Santa Ana Boulevard. <br />PROJECT REPORT EQUIVALENT 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.