My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - SANTA ANA GRADE SEPARATION PROJECT_Exhibit 2 in Color
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/02/2014
>
19E - SANTA ANA GRADE SEPARATION PROJECT_Exhibit 2 in Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:13:58 PM
Creation date
12/3/2014 4:08:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
12/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual Exhibit 6-A <br />Preliminary Environmental Study (PES) Form <br />Exhibit 6-A Preliminary Environmental Study (PES) Form <br />Federal Project No.: STPL 5063(136) Final Design: December 2012 <br />(Federal Program Prefix -Project No., Agreement No) (Expected Start Date) <br />To: Jim Kaufman, Chief, Office of Local Programs From: City of Santa Ana <br />(District Local Assistance Engineer) (Local Agency) <br />District 12 <br />Jason Gabriel – (714) 647-5664 <br />(District) (Project Manager's Name and Telephone No) <br />3347 Michelson Dr., Suite 100 20 Civic Center Plaza, M-36 <br />Irvine, California 92612-8894 Santa Ana, California 92701 <br />(Address) (Address) <br />Jim.Kaufman(odot.ca.gov JGabriel@santa-ana.org <br />(E-mail Address) (E-mail Address) <br />Is this Project "ON" the ❑ Yes IF YES, STOP HERE and contact the District Local Assistance Engineer <br />State Highway System? ® No regarding the completion of other environmental documentation. <br />Federal State Transportation Improvement Program <br />(FSTIP) http://www.dot.ca.gov/hq/transprog/fedpgm.htm: <br />2011 <br />(Currently Adopted Plan Date) <br />21 <br />(Page Naattach to this form) <br />Programming Preliminary Engineering Right of Way Construction <br />for FSTIP: Prior $ 1.5M N/A $ N/A N/A S N/A <br />(Fiscal Year) (Dollars) (Niscal Year) (Dollars) (Niscal Year) (Dollars) <br />Project Description as Shown in RTP and FSTIP: FTIP No. ORA082610: Santa Ana Blvd Grade Separation - Near the <br />Expansion of the Santa Ana Regional Transportation Center (SARTIC). Initial planning and conceptual engineering phase. Related to <br />ORA 81621. <br />Detailed Project Description: (Describe the following, as applicable: purpose and need, project location and limits, required right of way <br />acquisition, proposed facilities, staging areas, disposal and borrow sites, construction activities, and construction access) <br />Project Name: Santa Ana Boulevard Grade Separation Project. The City of Santa Ana, in coordination with the California <br />Department of Transportation (Department), is proposing to grade separate the existing Santa Ana Boulevard/Orange County <br />Transportation Authority (OCTA) Metrolink at -grade railroad crossing in the City of Santa Ana, Orange County, California. The <br />purpose of the proposed project is to improve safety, as it will remove the existing at -grade conflict between vehicular traffic and rail <br />traffic. In addition, the proposed project would reduce the congestion and inconvenience caused by this existing at -grade facility. See <br />page 1 for complete. Project Description. <br />(Continue description on "Notes" sheet, last page of this Exhibit, if necessary) <br />Preliminary Design Information: <br />Does <br />the <br />project involve any of the following? Please check the appropriate boxes and delineate on an attached map, plan, <br />or layout <br />including any additional pertinent <br />information. <br />Yes <br />No <br />Yes <br />No <br />Yes <br />No <br />® <br />❑ <br />Widen existing roadway <br />® <br />❑ <br />Ground disturbance <br />® <br />❑ <br />Easements <br />❑ <br />® <br />Increase number of through lanes <br />® <br />❑ <br />Road cut/fill <br />® <br />❑ <br />Equipment staging <br />❑ <br />® <br />New alignment <br />® <br />❑ <br />Excavation: anticipated <br />® <br />❑ <br />Temporary access road/detour <br />❑ <br />® <br />Capacity increasing—other <br />maximum depth 25 feet <br />® <br />❑ <br />Utility relocation <br />(e.g., channelization) <br />® <br />❑ <br />Right of way acquisition <br />® <br />❑ <br />Drainage/culverts <br />(if yes, attach map with APN) <br />® <br />❑ <br />Realignment <br />❑ <br />® <br />Flooding protection <br />❑ <br />® <br />Ramp or street closure <br />❑ <br />® <br />Stream channel work <br />® <br />❑ <br />Disposal/borrow sites <br />® <br />❑ <br />Bridge work <br />® <br />❑ <br />Pile driving <br />❑ <br />® <br />Part of larger adjacent project <br />® <br />❑ <br />Vegetation removal <br />® <br />❑ <br />Tree removal <br />® <br />❑ <br />Demolition <br />® <br />❑ <br />Railroad <br />Required Attachments: <br />® Regional map ® Project location map ® Project footprint map (existing/proposed right of way) <br />❑ Engineering drawings (existing and proposed cross sections), if available ❑ Borrow/disposal site location map, if applicable <br />(Note: all maps (except project location map and regional maps) should be consistent with the project description (minimum scale: 1 " = 200).) <br />® Notes to support the conclusions of this checklist/project description continuation page (attached) <br />Page 6-69 <br />LPP 08-02 May 30, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.