My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRANSPORTATION CORRIDORY AGENCY - PUBLIC HEARING NOTICE - EST 1986
Clerk
>
Contracts / Agreements
>
T
>
TRANSPORTATION CORRIDOR AGENCY - TCA
>
TRANSPORTATION CORRIDORY AGENCY - PUBLIC HEARING NOTICE - EST 1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2015 2:37:29 PM
Creation date
12/9/2014 12:38:09 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Right -of -Way <br />Credit will be given for right -of -way dedication at the rate of <br />$50,000 per acre except for slope easements and a 120 -foot -wide strip <br />along centerline of the transportation corridor which would normally <br />be required for arterial highway dedication. <br />3. Grading <br />Credit will be given for earthwork, road and slope drainage, <br />buttressing, stabilization, hydroseeding and erosion control at the <br />following combined rates: <br />Corridor Segment <br />SAN JOAQUIN RILLS TRANSPORTATION CORRIDOR <br />Jamboree to Station 511 +50 <br />Station 511 +50 to Moulton Parkway <br />Moulton Parkway to Paseo de Colinas <br />FOOTHILL/EASTERN TRANSPORTATION CORRIDOR <br />Credit Rate <br />$149,784 per acre road easement <br />$124,132 per acre road easement <br />S124,915 per acre road easement <br />Foothill/Eastern Corridor 6137,060 per acre road easement <br />The term road easement as used above includes the entire area within <br />right -of -way (hinge point to hinge point) excluding slope and drainage <br />easements. The credit values furthermore include percentages or work <br />estimated for engineering, administration and contingencies for the <br />respective transportation corridors. <br />I 4. Drainage Structures <br />Credit will be given for drainage structures in accordance with <br />lengths of pipe and unit prices estimated as costs in the fee program <br />or for as -built structures which the Director, EMA or his designee <br />determine are reasonable equivalents of the structures in the fee <br />program cost estimate. Unit prices for as -built drainage structures <br />will be those used in the latest fee program cost estimate. <br />Engineering and administration credit of 156 of the drainage structure <br />credit will be added. Contingency credit of 10% of the drainage <br />structure credit will be added. Terrace drains, downdrains and <br />temporary drainage facilities or erosion control facilities are <br />included in the average unit cost of grading. <br />S. Other Improvements <br />Credit will be given for other improvements at the rate at which the <br />improvement was estimated in the fee program plus 159 for engineering <br />and administration plus 108 for contingencies. <br />The credit rates specified above will be revised whenever the corridor <br />cost estimates are revised for the purpose of adjusting fees. Once <br />-23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.