Laserfiche WebLink
received by each zone. Exhibits VII and VIII show the <br />method in which these calculations were made. <br />The fee program share of the original estimate of <br />Corridor Cost shown below represents an estimate of <br />the share attributable to new development. It is <br />expected that this share may change as future <br />revisions are made to the fees. <br />TABLE VIII -1 <br />FEE PROGRAM SHARE OF CORRIDOR COST <br />Total Corridor <br />Costs ($) <br />SJHTC <br />Zone A <br />Zone B <br />Total <br />F /ETC <br />Zone A <br />Zone B <br />Total <br />$341,660,000 <br />$516,147,000 <br />B. Determination of Base Fee <br />Developers <br />Share M Share ($) <br />28.6% $ 97,856,775 <br />19.8% $ 67.643.330 <br />48.4% $165,500,105 <br />25.8% $133,096,099 <br />22.7% $117.131.975 <br />48.5% $250,228,066 <br />The cost attributable to future development must be <br />reduced to a fee so that it may be apportioned in an <br />equitable manner to specific types of development. <br />Allocation of the cost on the basis of trip end <br />generation by general land use category is proposed, <br />where: <br />cost apportioned to future development in the AOB zone <br />cost /trip end trip end growth in the AOB zone <br />—23— <br />