Laserfiche WebLink
=rBIT VIII <br />page 1 of 2 <br />PEE pRAMM SEEM OF TOTAL CORRIDOR COST <br />TOOTHILL/ZhSTERN TRANSPORTATION CORRIDOR <br />1percent corridor TE due to growth - trip ends due to growth <br />Total Wily, Ends <br />Zpesoent corridor users TE by sons ` g�ation tri of todtal trip ends <br />3peroant corridor user '!E due to growth ` percent corridor ousers S <br />TE by Bone <br />V220 -19 <br />-46- <br />Outside <br />%one A <br />Zone B <br />AOB <br />Corridor User Trips With One or Both Ends in Zone <br />Trips beginning and ending in sane <br />27,922 <br />1,322 <br />20,555 <br />(Total due growth) <br />28,200 <br />11.657 <br />370307 <br />s) <br />(Total trips) <br />ZA/Out Tripe <br />(Trips due growth) <br />68,629 <br />31,320 <br />460004 <br />64,217 <br />88,512 <br />s <br />(Total trips) ) <br />80,763 <br />out/In Trips <br />(Trips due is growth) <br />75,449 <br />33,648 <br />45,760 <br />55,069 <br />79,696 <br />(Total trips) <br />89,823 <br />Trip Und AnalYsis <br />(Trip ends due to growth) <br />1990922 <br />83,512 <br />115,076 <br />160,396 <br />242,822 <br />(Total trip ends) 1 <br />(percent corridor TE due to growth)2 <br />226,986 <br />18.08% <br />72.66% <br />66.05% <br />(percent corridor users TE by Zone) <br />due to <br />38.18% <br />34.18% <br />19.66% <br />14.30% <br />41.52% <br />27.42% <br />(percent corridor mars TE growth)3 <br />1percent corridor TE due to growth - trip ends due to growth <br />Total Wily, Ends <br />Zpesoent corridor users TE by sons ` g�ation tri of todtal trip ends <br />3peroant corridor user '!E due to growth ` percent corridor ousers S <br />TE by Bone <br />V220 -19 <br />-46- <br />