Laserfiche WebLink
attached hereto as Exhibit "A" and incorporated by reference <br />herein. <br />SECTION 2. The estimated cost of these major <br />thoroughfares and bridges are as follows: <br />San Joaquin Hills <br />Transportation Corridor $3 45,213,000.00 <br />Foothill /Eastern <br />Transportation Corridors $52105161000.00 <br />The Program is presently designed to collect 48.4% of the <br />cost of construction of the San Joaquin Hills Transportation <br />Corridor and 48.5% of the cost of construction of the <br />Foothill /Eastern Transportation Corridors. <br />SECTION 3. The fees for development within the <br />areas of benefit are based on the trip ends generated by the <br />development as determined from the Trip Generation Tables <br />included in the Program and shall be assessed upon new <br />development based upon the number of dwelling units included <br />in the development (for residential projects) or the gross <br />square footage of the development (for nonresidential <br />projects) as followat <br />SAN JOAQUIN HILLS TRANSPORTATION CORRIDOR <br />Rounded <br />Zone A Fee Fee <br />Single- family residential $1,31,9 /unit $1,320 /unit <br />Multi -unit residential $ 768 /unit $ 770 /unit <br />Non- reiidential $1.77 sq.ft. $1.75 /sq.ft. ' <br />Zone _.B <br />Rounded <br />Fee Few <br />Single - family residential $1,02.1 /unit $1,020 /unit <br />Multi -unit residential $ 596 /unit $ 595 /unit <br />Non - residential $1.31 sq.ft. $1.30 sq.ft. <br />-2- <br />