Laserfiche WebLink
All disputes over application of fees to specific projects or disputes over <br />exemptions of projects from fee requirements shall be presented to the Joint <br />Powers Agency described in Section XIII of this report for resolution. <br />Examples of fee calculations: <br />1. The fee for a development consisting of 100 single - family detached units, <br />300 condo units and 25,000 s.f. of office and Neighborhood Shopping <br />Center uses, calculated upon original rates, would be: <br />San Joaquin Hills AOB (Zone A): <br />(100 D.U. x $1305/D.U.) <br />_ $130,500 <br />(300 D.U. x $760/D.U.) <br />_ $228,000 <br />(25,000 S.F. x $1.75 S.F.) <br />_ $ 43,750 <br />Total fee for development if located in <br />Zone A of SJHTC AOB = $402,250 <br />Foothill/Eastern AOB (Zone B): <br />(100 D.U. x 920/D.U.) _ $ 92,000 <br />(300 D.U. x $535/D.U.) _ $160,500 <br />(25,000 S.F. x $1.05 /S.F.) _ $ 26,250 <br />Total fee for development if located in <br />Zone B of Foothill/Eastern AOB = $278,750 <br />2. Total fee for reconstruction of a 10,000 s.f. office building to a 15,000 s.f. <br />Neighborhood Shopping Center would be calculated as follows: <br />San Joaquin Hills AOB (Zone B): <br />(5,000 s.f. x $1.30 /s.f.) <br />Total fee for development if located in <br />Zone A of SJHTC AOB = <br />Foothill /Eastern AOB (Zone A): <br />(5,000 s.f. x $1.80 /s.f.) <br />Total fee for development if located in <br />Zone A of Foothill/Eastem AOB = <br />223512_2.DOC 27 <br />$ 6,500 <br />$ 6,500 <br />$ 9,000 <br />$ 9,000 <br />