My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRANSPORTATION CORRIDOR AGENCY - SAN JOAQUIN CORRIDOR
Clerk
>
Contracts / Agreements
>
T
>
TRANSPORTATION CORRIDOR AGENCY - TCA
>
TRANSPORTATION CORRIDOR AGENCY - SAN JOAQUIN CORRIDOR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 2:54:48 PM
Creation date
12/9/2014 1:57:58 PM
Metadata
Fields
Template:
Contracts
Company Name
TRANSPORTATION CORRIDOR AGENCY - FOOTHILL / EASTERN - JOINT POWERS AGREMEENT
Contract #
A-1986-008
Agency
Clerk of the Council
Destruction Year
P
Notes
A-86-008;
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />2 <br />3 <br />1 <br />S <br />6 <br />7 <br />9 <br />10 <br />11 <br />121 <br />131 <br />14 <br />It a IS <br />a <br />as" <br />o 16 <br />S <br />• r • 17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />2S <br />w <br />- <br />26 <br />7 <br />M <br />t <br />27 <br />23 <br />NOWO TMt..teeORE, BE IT RESOLVED that as a condition of approval <br />of subdivisions containing within their boundaries portions of <br />transportation corridors shown on the Transportation Element of the <br />County General Plan the developer shall: <br />1. Dedicate right- of-way to County. <br />2. Grade corridor right -cfway in accordance with schematic <br />plans approved on the tentative snap and rough grading plans approved <br />by the Director, IM. <br />3. Construct arterial overcrossings for internal arterials. <br />Width of overcrossing structure (i.e., number of travel lanes) is to <br />be determined based upon vehicular and pedestrian traffic generated <br />by the proposed project. <br />4. Construct corridor travel lanes and interchange ramps <br />required immediately for access to proposed development or system <br />continuity (closure of short gaps). Number of lanes required is to t <br />based upon traffic generated by proposed project. <br />5. Participate, among other designated beneficiaries, in any <br />established corridor development fee program. Costs incurred pursuar. <br />to Conditions 2 through 4 shall be creditable against fees. Costs <br />incurred pursuant to Condition 1 shall be creditable against fees to <br />the extent that the develop - =t fee program includes said right- of -wa. <br />cost. <br />BE IT FURTHER RESOLVED that EMA is hereby directed to amend <br />appropriate seotiohs of the Subdivision and Zoning Codes to implement <br />this policy. <br />BE IT FURTHER RESOLVED that EM is hereby directed to incorporate <br />In General Plan amendment elements, soning actions, area plans and <br />site plans recommendations appropriate for implementing this policy. <br />-38- <br />
The URL can be used to link to this page
Your browser does not support the video tag.