Laserfiche WebLink
attached hereto as Exhibit "A" and incorporated by reference <br />herein. <br />SECTION 2. The estimated coat of these major <br />thoroughfares and bridges are as follows: <br />San Joaquin Hills <br />Transportation Corridor $3 45,2131000.00 <br />hoothill /Eastern <br />Transportation Corridors $5210516,000,00 <br />The Program is presently designed to collect 48.44 of the <br />cost of construction of the San Joaquin Hills Transportation <br />Corridor and 48.5% of the cost of construction of the <br />Foothill /Esstorn Transportation Corridors. <br />SECTION 3. The fees for development within the <br />areas of benefit are based on the trip ends generated by the <br />development as determined from the Trip Generation Tables <br />included in the Program and shall be assessed upon new <br />development based upon the number of dwelling units included <br />in the development (for residential projects) or the gross <br />square footage of the development (for nonresidential <br />projects) as follows: <br />SAN JOAQUIN HILLS TRANSPORTATION CORRIDOR <br />Rounded <br />Zone A Femme P'ee <br />Single- family residential <br />Multi -unit residential <br />Non- reiidential <br />Zone 8 <br />Single - family residential <br />Multi -unit residential <br />Non - residential <br />-2- <br />$1,319 /unit <br />$ Ue /unit <br />$1.77 aq.ft. <br />Fee <br />$1,021 /unit <br />$ 596 /unit <br />$1.31 sq.ft. <br />$lr320 /unit <br />$ 770 /unit <br />$1.75 /sq.ft, <br />Rounded <br />Fee <br />$1,0'20 /unit <br />$ 595 /unit <br />$1.30 sq,ft. <br />