My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. 7 - 2014
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. 7 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 11:58:18 AM
Creation date
12/10/2014 11:38:55 AM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2014-240
Agency
PUBLIC WORKS
Council Approval Date
10/21/2014
Expiration Date
10/6/2017
Insurance Exp Date
10/1/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rudolfo Rosas <br />August 25, 2014 <br />Page 6 <br />I Change Orders: Tetra Tech will evaluate and respond to contractor's request for change <br />orders. For this proposal, we have assumed a total of six (6) change orders will need our <br />attention. Tetra Tech will provide a summary of the contractor's request, breakdown of the <br />additional monies requested, and reasonableness of the request. We have assumed the <br />evaluation will include a meeting with the City's on-site inspector to discuss the changed <br />conditions. <br />i. Record Drawings: Tetra Tech will prepare record drawings based on contractor's red -lines <br />and any comments/revisions provided by the City's construction manager. Tetra Tech will <br />provide two copies of the final documents, digital and hard copy. All drawings will be <br />completed and provided in mylar format, in digital drawing format, and in pdf format. <br />j. General Assistance to Construction Manager: Tetra Tech recommends the City include a <br />budget for providing office support to the City's Construction Manager during the construction <br />phase. This support will include answering questions over the phone/e-mail, discussing issues, <br />and providing general assistance as requested by the CM. For this proposal; we have assumed <br />a total of two (2) hours per month over the twelve (12) month duration of the project. <br />SCHEDULE <br />Tetra Tech will be able to start work immediately upon receipt of the Notice to Proceed. We envision <br />the design criteria will be able to be resolved, discussed with the City and decisionstdirections made <br />with the City within six (6) to eight (8) weeks from the Notice to Proceed. The updates to the plans and <br />specifications, once the design criteria are agreed upon, can be completed within six (6) additional <br />weeks. Therefore, we will be able to have plans and specifications ready for permit submittal to the <br />City within three (3) to four (4) months from the Notice to Proceed. We are hoping that the PLC Panel <br />design and control strategies will be able to be completed concurrently. <br />SUMMARY <br />Tetra Tech will perform these services on a Time and Material basis with the below Not -to -Exceed <br />Fee, based on the hourly rate schedule included within our On -Call Water Resource Engineering <br />Services Consultant Agreement with the City. Our Not -to -Exceed Fee includes all labor, materials, and <br />other direct costs for all of the work anticipated within the above scope of work. <br />1 <br />Update Design Criteria <br />$ 42,700 <br />2 <br />Update Plans <br />$ 45,000 <br />3 <br />Update Specifications and Estimates <br />$ 19,900 <br />4 <br />PLC Panel Design and Control Strategies <br />$ 121,200 <br />5 <br />Bidding Support Services <br />$ 5,000 <br />6 <br />Construction Support Services <br />$ 131,200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.