Laserfiche WebLink
CDS unit with a capacity of 1 cfs. The vortex (CDS) will further remove sediments and floatables and <br />then flows to the storage chamber prior to being discharged to the OCSD sanitary sewer system. <br />The following features will be incorporated into the final design: <br />• Retractable m- channel screening with a maximum 5mm openings and therefore qualifying as a full <br />removal system. <br />• Incorporate in- channel inlets to divert low -flow urban discharges into a series of Vortex (CDS) gross <br />solids removal chambers prior to discharging into underground storage facilities. <br />• Approximately 21,000 gallons of underground storage vaults to temporarily hold diverted flows prior <br />to discharging into the regional sanitary sewer system. <br />• Two 150 gpm sump pumps discharging into a new force main sanitary sewer pipeline. <br />• Approximately 7,5001f feet of 8" sanitary sewer force main from the channel diversion facilities to <br />the regional sanitary sewer system located at the intersection of Campus Drive and MacArthur <br />Boulevard. <br />The following figures provides for graphical representation of the proposed project layout. <br />25F1134 <br />