My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CDFW regulates all activities that modify the bed, bank, or channel of streams, lakes, and their <br />associated riparian habitats under Section 1600 (el seq.) of the CFGC. A CDFW Lake and <br />Streambed Alteration Agreement (LSAA) will be required for all activities resulting in impacts to <br />streambeds and associated riparian habitats. URS will prepare and submit a LSAA package to <br />CDFW to obtain CFGC 1602 (et seq.) compliance. <br />URS will also informally correspond with applicable state and federal regulatory and resource <br />agencies (e.g., CDFW, USACE, and RWQCB) as needed during the permitting phase to identify <br />potential data requirements, minimization, and /or avoidance measures, and mitigation, if needed, <br />to implement the Project. <br />Assumptions for Biological Resources, Jurisdictional Delineation and Agency Perinining <br />• The preferred alternative will be finalized prior to permit application submission. <br />• The City will provide necessary Project- specific documentation and components for <br />application packages, which may include, but us not limited to, an hydrology /drainage report, <br />water diversion plan (if work will be completed in wet portions of the channel), Best <br />Management Plans, cubic yards of cut and fill, construction period and duration, and any other <br />relevant documents and data required for permit applications other than the requisite items <br />produced in this scope. <br />• This scope assumes that the project can be permitted through a Nationwide Permit and does <br />not include the production of a USACE Individual Permit and associated 404(b)(1) analysis. <br />• This scope does not include Federal or California Endangered Species Act (ESA) protocol <br />surveys, consultation, or ESA permitting, if necessary for Project implementation. <br />• This scope does not include the production of a compensatory mitigation plan for Project <br />impacts to aquatic resource areas, should mitigation be required. <br />• This scope does not include agency permit filing fees, potential CEQA filing fees, <br />compensatory mitigation fees, or an environmental filing fee (Fish and Game Code Section <br />711.4). <br />Task 4 -Final Design <br />Final design will be completed in accordance with The City of Santa Ana's Engineering Design Standards <br />and Standard Plans for Street and Sewer Projects, Orange County Public Works Standards and Standards <br />Design Process Manual. URS will address the following items during final design: <br />4.1 Construction Specifications — URS will prepare the Construction Specifications in Microsoft Word in <br />standard 8 1/2 x 11 format for the Delhi Diversion Project utilizing the latest Edition of the <br />Greenbook: Standard Specifications for Public Works Construction. The City of Santa Ana will <br />provide the specification boiler plate for the front -end documents related to bidding, agreements, <br />general provisions, and special provisions. The special provisions will be tailored by URS for the <br />project. URS will submit the construction specifications for the City and stakeholders reviews at the <br />75 %, 100% and Final Design Submittals. <br />4.2 Construction Plans — URS will prepare detailed construction drawings in Microstation V8i using the <br />City of Santa Ana CADD Standards. Construction plans will be prepared on standard 24 -inch x 36- <br />inch sheet with City of Santa Ana title block. Pipeline plan and profile sheets will be prepared (e.g. <br />profile over plan view) at a scale of 1 " =40' horizontal and 1 " =4' vertical. This will include general <br />plans, civil plans, mechanical plans, and associated details. The horizontal and vertical control will be <br />UM 25F2952 <br />
The URL can be used to link to this page
Your browser does not support the video tag.