Laserfiche WebLink
LXMMIK1 <br />42 <br />e <br />S -2 <br />Delhi Diversion Channel - Structural Sections and Reinforcement Details <br />43 <br />S -3 <br />DelhiRamp /Wall Structural Details <br />44 <br />S -4 <br />Pre -Cast Vault Placement and Construction Details <br />45 <br />S-5 <br />Pump Wet Well Structural Sections and Reinforcement Details <br />46 <br />S -6 <br />Structural Miscellaneous Details <br />47 <br />S -7 <br />Structural Miscellaneous Details <br />48 <br />S -8 <br />Structural Miscellaneous Details <br />49 <br />E -1 <br />Standard Symbols and Abbreviations <br />50 <br />E -2 <br />Site Plan for Santa Ana Delhi Channel <br />51 <br />E -3 <br />Process and Control Diagrams <br />52 <br />E -4 <br />Conduit Schedule and Routing Plan <br />53 -H <br />TC -1 thru 16 <br />Traffic Control Plans <br />70 <br />TC -17 <br />Traffic Control Details <br />URS will submit the construction drawings for the City and stakeholders reviews at the 75 %, 100% <br />and Final Design Submittals. <br />4.3 Traffic Control Plans — URS will prepare detailed traffic control plans for all proposed pipelines and <br />facilities. The traffic control plans will be prepared in accordance with, and approved by, the <br />appropriate agency (e.g. Cities of Newport Beach, Costa Mesa, County of Orange, and /or others). <br />The traffic control plans will be included in the set of construction plans and will take construction <br />phasing into consideration. The traffic control plans will be prepared at 1"=40' scale with two plan <br />view panels per sheet. URS will work closely with all project stakeholders when preparing the traffic <br />control plans in order to develop plans that meets their access needs. <br />4.4 Utility Disposition —During the final design phase, URS will collect utility as -built drawings from <br />Cities of Costa Mesa, Newport Beach, the County of Orange, SC Edison, the Gas Company, telecom <br />companies, and other agencies and private parties in order to create a utility base map for final <br />design. We will also perform a web search of USA Digalert's online database to locate all of the <br />utilities in the project vicinity and then contact each utility owner to request a copy of their available <br />as -built drawings, We have included budget in our fee estimate for purchasing utility as -built plans. <br />The as -bats will be used to create an Auto CAD utility map for the project. We will field walk the <br />proposed pipeline alignments after the base map has been created in order to field verify utility <br />locations and surficial appurtenances (i.e. O/H utilities, valve cans, manholes). <br />4.5 Aerial Survey and Topographic Mapping — Current aerial topography and existing planimetrics data <br />will be obtained for the Sanitary Sewer Pipeline alignments. The photography will be flown for use at <br />a scale of 1" = 40', with contours compiled at 1 -foot intervals. Spot elevations and existing site <br />features identifiable from photography will also be compiled. In an effort to provide sufficient <br />coverage for design, the aerial limits will extend to extend approximately 50 -feet beyond the public <br />right -of -way. This line item includes the field work to set horizontal and vertical control required for <br />the aerial effort, which will be based on Orange County NAD83 horizontal control, and NAVD88 <br />vertical control present in the area. Deliverables will include a digital CAD file containing the <br />resulting data along with a color digital ortho -photo prepared from the photography. The ortho- <br />photo will be a rectified image so as to match the compiled topography as closely as possible, <br />providing the capability to prepare accurate, color exhibits of the property on subsequent efforts. <br />® Supnlemer ntal Touo aphy —As a supplement to the aerial effort, conventional ground survey <br />will be used to locate significant features not reflected by aerial photography, and obtain <br />additional detail in key areas. Visible indications of surface utilities will be located, as will rim <br />UM __ 25P 55 <br />