My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RJM DESIGN GROUP INC. 2 - 2014
Clerk
>
Contracts / Agreements
>
R
>
RJM DESIGN GROUP INC. 2 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 11:50:27 AM
Creation date
12/30/2014 4:00:58 PM
Metadata
Fields
Template:
Contracts
Company Name
RJM DESIGN GROUP INC.
Contract #
A-2014-223
Agency
PUBLIC WORKS
Council Approval Date
9/16/2014
Expiration Date
9/30/2015
Insurance Exp Date
9/30/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />APPENDIX -- <br />ATTACHMENT A <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />LANDSCAPE ARCHITECTURAL DESIGN SERVICES <br />FOR PACIFIC ELECTRIC PARK <br />RFP NO.; 14-036 <br />SCOPE OF WORK <br />Project Understanding <br />The proposed "Pacific Electric Park" will be a new 1.4 acre neighborhood park, as represented in the concept plan <br />included herein as part of Attachment A, and shall include but not necessarily be limited to the following <br />components: <br />• Themed Playground <br />• Themed Restroom Building <br />• Picnic area with Shade Structure <br />• Community Garden <br />• Fruit Tree Grove <br />• Gardening Classroom with seating <br />• Amphitheatre <br />• Security Lighting along walkways <br />• Drought tolerant plant palette <br />• Dry Stream <br />• Automatic irrigation system <br />Decomposed Granite Walkways <br />• Monument signs (2) <br />• Park Operation signs (2) <br />• Site Furnishings (benches, bike racks, trash receptacles, drinking fountain, picnic tables) <br />• Property Line wall <br />• Exercise Course <br />Pre - Design <br />Preliminary design phase shall include Kick -off meeting with City Staff to discuss conceptual design plan, project <br />goals and objectives, potential elements and issues, schedule, review of existing information, and conduction of a <br />site investigation <br />Design Development <br />Design development phase will involve development of plans based upon City- provided conceptual design plan. <br />Deliverables from this phase include, but are not limited to, schematic development of landscape architectural, <br />architectural, civil engineering, and electrical engineering. This phase shall also include draft outline specification <br />and "opinion of estimated cost'. <br />City of Santa Ana RFP 14 -036 m _ <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.